Installation
Electrical contact densimeter threshold inspection
G51--101EN03
4/4
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Placing the densimeter in communication with the SF
6
volume
Process
To put in communication the densimeter tighten torque the nuts only (1) on
3 poles, which allow to open the valves “DILO” and put into communication
of the densimeter (2).
1
2
1
POLE 1
POLE 3
POLE 2
G
A
S
NOT
UNSCREW
G
A
S
11 daNm
Содержание FKG1X
Страница 2: ......
Страница 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 75: ...This page is intentionally blank This page is intentionally blank...
Страница 191: ...GRID ALSTOM Grid SAS 130 rue L on Blum 69611 Villeurbanne France This page is intentionally blank...
Страница 197: ...GRID ALSTOM Grid SAS 130 rue L on Blum 69611 Villeurbanne France This page is intentionally blank...