Maintenance
Maintenance plan
G51--001EN07
6/18
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Maintenance operations of circuit --breaker
(20000 guaranteed mechanical cycles)
Guide
The table below is a guide of the operations to be carried out at each mainte-
nance stage :
MAINTENANCE VISITS
(1 or 2 times a year)
INSPECTION
(every 5 years)
OVERHAUL
(OPERATING TIME : 20 years)
OVERHAUL
(ELECTRICAL WEAR : see “Electrical wear limits”,
module S51--051)
OVERHAUL
(MECHANICAL OPERATIONS :
10 000 cycles)
REVISION
for the ventilation (FKG1XP--XV--XW)
(SERVICE LIFE:
≥
25,000 hours/fan)
` J J J J
Operation counter reading.
` J J
Overall inspection : appearance (corrosion, paint-
work, signs of overheating).
J J J J
Inspect the insulating envelopes of poles.
` J J J J
Check the condition of crank lever assembly (axles,
retaining, clips,...).
` J J J J
Check operation of permanent heating. Check condi-
tion of air vents.
` J J
J
Check SF
6
pressure, (if the circuit breaker is supplied
with a permanent pressure gauge).
`
It is advisable to perform at least 2 CO duty cycles per
year,
when apparatus are scarcely used
, in order
to check that circuit--breaker and associated control
circuits are working properly.
` J J J
Check SF
6
densimeter thresholds. Then adjust pres-
sure to its rated value.
` J J J
Measure operating times of poles and auxiliary con-
tacts, at rated voltage and pressure.
` J J J
Measure resistance of main contacts.
J J
J
Check tightening of parts not subjected to pressure
(frame -- deck -- cubicle).
∗
J J
J
Check tightening of low voltage terminals (
∗
6 months
after commissioning).
J J
J
Check relay operation.
J J
J
Check latch operation.
J J J J
Carry out operations at recommended duties and
rated voltage.
J
J
Change doors seals, sidepanelsseal and roofs seals.
Legend : (
J
Compulsory) (
`
Recommended)
Continued on next page.
Содержание FKG1X
Страница 2: ......
Страница 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 75: ...This page is intentionally blank This page is intentionally blank...
Страница 191: ...GRID ALSTOM Grid SAS 130 rue L on Blum 69611 Villeurbanne France This page is intentionally blank...
Страница 197: ...GRID ALSTOM Grid SAS 130 rue L on Blum 69611 Villeurbanne France This page is intentionally blank...