background image

2

017-947-B1-001, Rev. A1 (08/2021)

2.0  Battery Installation and Wiring 

1.  Load batteries into cabinet with the positive terminals (+) facing forward. Coat the hardware and battery terminals with 

electrical contact lubricant and assemble the battery cables, PTS and hardware as shown in the illustrations below.  

Torque hardware to 110 in-lbs (12.43 Nm).

2.  The 12V batteries can be wired in parallel, up to four batteries total, to extend standby runtime.  Other factors such as 

cabinet size and company policies may depict the number of batteries utilized at a specific site. For sites with multiple 

batteries, the individual battery voltages are not available in monitoring systems due to the parallel wiring connectivity.

3.  With a MIDTRONICS

®

 Conductance meter (Celltron

®

 Essential, Celltron

®

 Advanced or equivalent) measure the 

conductance value (MHOS) of each battery and record for use in Section 5.2 

Battery Configuration. 

Also, record the 

battery date code on the battery label for entry on the DATE SET screen.

Verify battery voltage, cable color, connection and polarity are correct before proceeding. 

WARNING! ELECTRICAL HAZARD

A single 12Vdc battery.

Two 12Vdc batteries wired in parallel 

provide 12Vdc output with double the Ah 

capacity of each individual battery.

Three 12Vdc batteries wired in parallel provide 

12Vdc output with triple the Ah capacity of each 

individual battery.

Precision Temperature Sensor (PTS) 

 

p/n 746-331-20

 

12V

Battery Cable Connector

(to XM3.1-HPL Power Supply)

PTS

12V

12V

Battery Cable Connector

(to XM3.1-HPL Power Supply)

PTS

Fuse

Tools Required:

•  True RMS Digital multimeter

•  Socket wrenches, insulated

•  Box end wrenches, insulated

•  Torque wrench calibrated in in-lbs

The battery terminal hardware is subject to change based on battery make and model.

NOTICE:

•  NO-OX

®

 Corrosion Inhibitor

2-Pole Connector, 

p/n 545-466-10

2-Pole Connector, 

p/n 545-466-10

To XM3.1-HP 

Power Supply

To XM3.1-HP 

Power Supply

To XM3.1-HP 

Power Supply

12V

12V

12V

PTS

Fuse

Fuse

Fig. 2-1, Battery Wiring Diagrams and Precision Temperature Sensor

Содержание BROADBAND UPS XM3.1-HP

Страница 1: ...lled 1 Line Cord IEC Input 9 Alarm LED 17 Ethernet ETH Connector 25 SFP Port 2 Aux Output 110Vac 220Vac RMS 10 Self Test Button 18 LNK CPE Link Status 3 Output 1 Voltage set by Vout Selection 11 Local...

Страница 2: ...record the battery date code on the battery label for entry on the DATE SET screen Verify battery voltage cable color connection and polarity are correct before proceeding WARNING ELECTRICAL HAZARD A...

Страница 3: ...AlphaCell 100XTV If using a spacer for the in line fuse link use M6 30 mm bolts For AlphaCell 4 0HP batteries use 1 4 20 UNC bolts for insert terminals If using a spacer for the in line fuse link use...

Страница 4: ...on Press ESC to return to the DATE SET screen and the down arrow to select the next battery Repeat the above steps for each remaining battery 7 Press DOWN arrow softkey and select BATT MODEL and from...

Страница 5: ...d and appear on the Smart Display and Transponder web page if the power supply detects one or more defective batteries or a problem with the Inverter Module Replace batteries or power supply as requir...

Страница 6: ...State Downstream DS Upstream US Online OL Rx Tx Power 1 Transponder Initializing Searching for Downstream DOCSIS channel s Flashing OFF OFF OFF 2 Downstream channel s locked searching for upstream ch...

Страница 7: ...0 001 LPE Enclosure 031 302 B0 001 Table 8 1 Mounting Options 7 0 Final Verification 7 1 Local Web Server Access By means of the installed CMM the enabled Ethernet port of the Alpha DOCSIS Transponder...

Отзывы: