background image

3

017-947-B1-001, Rev. A1 (08/2021)

1.  Connect PTS cable 

(Alpha p/n 746-331-20) 

to the PTS connector 

[12]

.

2.  Connect the Tamper Switch and RF cable to the transponder 

[14 and 20]

.

3.  Verify the SPI’s 

ON / ALT

 Toggle Switch is in the 

ALT

 position.

4.  Use a 0.6 × 3.5mm slotted screwdriver to connect the SPI’s line and neutral input cables to the Output 1 Connector 

[3]

. If a second SPI / ALT Box is present connect input cable to Output 2 Connector 

[4]

.

3.0  Power Supply Connections 

(Refer to Fig. 1-1)

Fig. 3-1, SPI toggle switch 

(shown in ALT position)

ALT       ON

Do not connect the SPI to the Aux Output connector. This connector is for special applications 

for powering ancillary equipment in the enclosure. 

WARNING! ELECTRICAL HAZARD

5.  Plug the optional Local/Remote Indicator (LRI) cable into the LRI connector 

[11]

. For 

existing LRI installations, use LRI adapter kit, 

p/n 875-952-20

.

6.  Turn AC breaker 

ON

 and verify it is the correct utility voltage at the outlet (per unit’s 

nameplate voltage). If correct, plug the line cord into the utility outlet.

7.  Verify correct battery voltage and polarity on battery cable connector with a digital 

voltmeter; if correct, plug the battery cable connector into the Battery Input 12V port 

[22]

.

The unit will begin a self-test at this time and system status information will be available via the 

Smart Display.

Use M6 × 20 mm bolts for threaded insert terminals on the AlphaCell

®

 100XTV. If using a spacer for the 

in-line fuse link, use M6 × 30 mm bolts. For AlphaCell

®

 4.0HP batteries, use 1/4" 20 UNC bolts for insert 

terminals. If using a spacer for the in-line fuse link, use 1/4-20 × 1-1/4" bolts.

 

CAUTION!

Fig. 2-2, Hardware Stack-up, Non-Fused Connection

Fig. 2-3, Hardware Stack-up, Fused Connection

Threaded Insert Terminals

Threaded insert terminals require the use of 1/4-20 × 3/4" (M6 × 20 mm) bolts. The use of 1" (25.4 mm) bolts will seriously 

damage the battery. The only exception is the terminal with the large spacer for the in-line fuse link. Apply conductive 

electrical grease (NO-OX

®

 Corrosion Inhibitor) on all exposed connections. Torque all nuts and bolts to 110 in-lbs (12.43 

Nm).

Precision Temperature 

Sensor (PTS)

Battery Cable

Battery Cable

Flat Washer

1/4-20 Nut

M6 Nut

Flat Washer

Split Washer

Spacer

Fuse

1/4-20 × 3/4" Bolt

M6 × 20 mm Bolt

Battery Terminal

Flat Washer

Split Washer

1/4-20 × 3/4" Bolt

M6 × 20 mm Bolt

1/4-20 × 3/4" Bolt

M6 × 20 mm Bolt

1/4-20 × 1-1/4" Bolt

M6 × 30 mm Bolt

4.0  Using the Smart Display

All operational functions, system testing, menus and alarms are available via the 

illuminated Smart Display. Display functions are accessible by following the indicated 

prompts above the four softkeys. Descriptions of the display functions are detailed 

below.

1

1st line: Input Voltage/Current and Output Voltage/Current

2

Describes Power Supply Mode of Operation

3

Describes Status of Functions

4

Functionality top level menu PWR, BATT, COMM and APPS

5

Softkeys (Menu-driven 

system configuration)

1

4

2

3

5

Fig. 4-1, Smart Display With  

Sample Screen

Содержание BROADBAND UPS XM3.1-HP

Страница 1: ...lled 1 Line Cord IEC Input 9 Alarm LED 17 Ethernet ETH Connector 25 SFP Port 2 Aux Output 110Vac 220Vac RMS 10 Self Test Button 18 LNK CPE Link Status 3 Output 1 Voltage set by Vout Selection 11 Local...

Страница 2: ...record the battery date code on the battery label for entry on the DATE SET screen Verify battery voltage cable color connection and polarity are correct before proceeding WARNING ELECTRICAL HAZARD A...

Страница 3: ...AlphaCell 100XTV If using a spacer for the in line fuse link use M6 30 mm bolts For AlphaCell 4 0HP batteries use 1 4 20 UNC bolts for insert terminals If using a spacer for the in line fuse link use...

Страница 4: ...on Press ESC to return to the DATE SET screen and the down arrow to select the next battery Repeat the above steps for each remaining battery 7 Press DOWN arrow softkey and select BATT MODEL and from...

Страница 5: ...d and appear on the Smart Display and Transponder web page if the power supply detects one or more defective batteries or a problem with the Inverter Module Replace batteries or power supply as requir...

Страница 6: ...State Downstream DS Upstream US Online OL Rx Tx Power 1 Transponder Initializing Searching for Downstream DOCSIS channel s Flashing OFF OFF OFF 2 Downstream channel s locked searching for upstream ch...

Страница 7: ...0 001 LPE Enclosure 031 302 B0 001 Table 8 1 Mounting Options 7 0 Final Verification 7 1 Local Web Server Access By means of the installed CMM the enabled Ethernet port of the Alpha DOCSIS Transponder...

Отзывы: