
Warning this manual contains the exclusive instructions for use for professionally qua
lifie
d
installers and/or maintenance technicians, in compliance with laws in force.
Th
e USER is not authorised to intervene on the boiler.
Th
e manufacturer will not be held liable in the case of damage to people, animals or property
due to the failure to observe the instructions contained in the manuals supplied with the boiler
INDEX
The company Alpha Heating Innovation (registered office - Nepicar House - London Road - Wrotham Heath - Kent - TN15 7RS), declares
that the design, manufacturing and after-sales assistance processes comply with the requirements of standard UNI EN ISO 9001:2015.
For further details on the product CE marking, request a copy of the Declaration of Conformity from the manufacturer, specifying the appliance
model and the language of the country.
Instructions on how to correctly dispose of the product.
At the end of its life, this appliance must not be disposed of as mixed municipal waste.
It is mandatory to separate this type of waste so that the materials making up the appliance can be recycled and reused. Contact
authorised operators for disposal of this type of appliance. Incorrect management of waste and its disposal has potential negative
eff
ects on the environment and on human health.
Th
e symbol on the appliance represents the prohibition of disposing of the product as mixed
municipal waste.
General information ............................................................4
1.1 General warnings ..........................................................................4
1.2 Symbols used in the manual ........................................................5
1.3 Compliant use of the appliance ...................................................5
1.4 Information for the system manager ..........................................5
1.5 Safety warnings .............................................................................6
1.6 Technical data plate ......................................................................7
1.7 Water treatment ............................................................................8
1.8 Boiler frost protection ..................................................................8
Technical features and dimensions............................................9
2.1 Internal view with indications of main components ...............9
2.2 Dimensions ..................................................................................10
2.2.1 Dimensions to install the boiler in heating control unit .......11
2.2.2 View to accessibility inside ........................................................12
2.3 Diagram of water side head losses ............................................13
2.3.1 Determination of the primary circuit pump or boiler pump 13
2.4 Functioning data / general features ..........................................14
2.4.1 Technical data according to the ErP directive ........................15
Instructions for installation ..............................................16
3.1 General recommendations ........................................................16
3.2 Regulations for installation........................................................16
3.3 Preventative checks and adaptation of the system .................16
3.5 Positioning the heating control unit.........................................18
3.6 Flue exhaust pipe connection ....................................................19
3.7 Connection ..................................................................................20
lling and emptying ......................................................22
3.9 Electrical connections ................................................................22
3.11 On-site measurement of the combustio
3.11.1 Enable the calibration function ...............................................28
3.11.2 Positioning the probes ..............................................................28
3.12 Burner adjustment ......................................................................29
Inspection and maintenance .............................................34
4.1 Instructions for inspection and maintenance .........................34
4.2 Adapt it for use with other gases ...............................................37
4.3 Programming the operation parameters .................................38
4.4 Wiring diagram for practical connection ................................40
Содержание ARES Pro 150
Страница 2: ......
Страница 43: ...43 Inspections and maintenance ...