Installation and Start Up
Alpha Technologies
2.3
Starting and Testing the ATS System
TIP: If at any time the system does not perform as described, carry out trou-
bleshooting as described in Section 3.8, 3.9 and 5.2 of this manual.
Step 1: Turn on Line Power
1
Verify the AC input & output and battery
circuit breakers on the 1800 TP are off.
2
Turn on the upstream circuit breaker.
3
Verify the load is receiving power. If not,
perform troubleshooting.
Go to Step 2
Step 2: Turn on the UPS
1
Turn on the battery circuit breaker.
The LCD display shows ”INVOFF”.
2
Turn on the AC input & output circuit
breaker.
Within 30 seconds the LCD display
changes to “LINE” showing line power is
within acceptable frequency and voltage
ranges. The unit is operating on line
power.
Go to Step 3
Alpha
5M 120/60N
Novus 1800 LINE