8
Subject to change without notice | 83059100fUK – Translation of the original operating manual | ait-deutschland GmbH
5.2 Storage
►
Do not unpack the unit until directly before
installation if possible.
►
Store unit protected against
●
Moisture/damp
●
Frost
●
Dust and dirt
5.3 Unpacking and transport
Notes on safe transport
The unit is heavy (
“Technical data / Scope of
supply”, page 17). There is a risk of injuries or
damage to property if the unit falls or overturns.
There is a risk of cutting your hands on sharp edges
of the unit.
►
Wear cut-resistant protective gloves.
The hydraulic connections are not designed for
mechanical loads.
►
Do not lift or transport the unit by the hydraulic
connections.
Transport the unit preferably with a pallet truck,
alternatively with a handcart or by carrying
►
Do not tilt the heat pump module by more than 45°.
►
The lashing straps on the heat pump module may
only be used when carrying by hand.
Transport with a pallet truck
►
Transport the unit to the place of installation
packaged and secured on a wooden pallet.
Unpacking
1.
Remove plastic films. Ensure that you do not
damage the unit.
2. Dispose of the transport and packaging material
in an environmentally friendly way and in
accordance with local regulations.
3.
Remove the film from the plastic element of the
front panel in the place of installation.
Lift the housing walls off the pallet and set
down.
If the unit is not transported by a pallet truck: do not lift
off the pallet until after unpacking and setting down the
housing panels.
4.2 Care
Wipe down the outside of the unit only using a damp
cloth or cloth with mild cleaning agent (washing-up
liquid, neutral cleaning agent). Do not use any harsh,
abrasive, acid or chlorine-based cleaning agents.
5 Delivery, storage, transport
and installation
ATTENTION
Damage to the housing and the unit components
due to heavy objects.
►
Do not place any objects on the unit which are
heavier than 30 kg.
5.1 Scope of supply
►
Check delivery immediately after receipt for
externally visible damage and completeness.
►
Notify supplier of any defects immediately.
The accompanying parts package contains
Package 1
● 3 flat seals 5/4ʺ
● 4 flat seals 1ʺ
Package 2
●
1 tube lubricant
●
1 HT-bend DN 40mm 87°
●
1 protective cover for plug
●
4 EPP screws
In façade package
●
2 screws M5x16, black for the front wall
●
15 screws for façade mounting M5x9
●
1 plastic louvre grille
●
1 heat pump blind cover
●
Swelling tape for louvre grille and blind cover
●
Documents (manuals, ERP data and label)
●
Type sticker