10
Subject to change without notice.
83054800bUK – Translation into English of the original German operating manual ait-deutschland GmbH
Pass the tube handles through the holes in the frame:
1 Holes in the frame, front and rear
Make sure that the tube handles do not damage cable
harnesses and components in the unit. Feed the tube
handles carefully past cable harnesses and components
in the unit…
Lift the unit with the inserted tube handles, with at
least four people (one for each tube handle) and carry
to the place of installation.
CAUTION
Carry the unit horizontally and secure it
against slipping.
Put down the unit at the place of installation. Make
sure that the unit's baseframe is in full contact with the
surface of the floor…
Remove the tube handles…
If the electrical connection work is not carried out
immediately, re-attach the lower facade panel on the
operating side.
LIFTING THE UNIT WITH TUBE HANDLES
The LW unit can be lifted with
3
⁄
4
” or 1” tube handles (to
be provided on site by the customer). Appropriate holes
are provided for these in the unit frame.
Remove the lower facing panels at the front and rear
of the unit.
1 Quick-release screws
2 Lower facing panel
To do this, undo the quick-release screws. Turn through
90° to the left…
Pull the lower facing panel upwards and outwards at an
angle, lift out and put in a safe place...