______________________________________________________________________
Alpha ESS Co., Ltd.
Page 7 of 45
Your Smart Energy
2.
Safety Instructions
Manual Keeping
This manual contains important information about operating the system. Before operating,
please read it very carefully.
The PCS should be operated in strict accordance with the description in the manual, in
case that it causes damage or loss to equipment, personnel and property.
This manual should be kept carefully for maintenance and reparation.
Operator Requirements
The operators should get a professional qualification, or be trained.
The operators should be familiar with the whole storage system, including compositions
and working principle of the system.
The operators should be familiar with the Product Instruction.
While maintaining it must ensure that two operators are in the field, and they cannot
operate any equipment until all of them are powered off and fully discharged.
It is strictly prohibited for any maintenance when equipments are on or charged.
Protection of Warning Sign
The warning sign contains important information for the system to operate safely, and it is
strictly prohibited to be torn or damaged.
Ensure that the warning sign is always clear.
The signs should be replaced immediately when damaged.
Setting of Warning Sign for Safety
While instructing, maintaining and repairing, in case of preventing unrelated personnel
nearby to cause incorrect operation or accident, the opinions below should be followed:
Obvious signs should be set at front switch and rear-level switch in case of accidents
caused by false switching.
Warning signs or tapes should be set near operating areas.
Keys of the system must be pulled out after maintenance or operation.
Live Line Measurement
High voltage in the container which may cause vital electric shock when touching by
accident.
Equipment protection must be taken in live line measurements (e.g.: insulation gloves).
The measuring equipment should be connected and used correctly to ensure personnel
safety. When measuring, at least two workers are needed.