background image

EMS Instruction

03

If you find the manual content is inconsistent with the software version, please contact 
AlphaESS in time.

3.1 Function Description

3.2 Introduction

3.2.1. Main menu

EMS INSTRUCTION

EMS INSTRUCTION

06

07

Table 1 Function Description

fault

Battery

Normal

Internet

Your Smart Energy

Figure 3-1 EMS Interface

 Main Interface

Indicator LED

Button Function

LCD Screen

D

I

B

A

C

O

b

ject

Name

D

e

s

crip

ti

on

A

Green: 

Allow the battery to charge or discharge

Green:

 

The system is operating normally

Flash:

 

Don’t allow the battery to charge or discharge

Green:

 

 Server Connected

Red: 

Fault

Down Button: Move cursor to downside or decrease value
Return Button: Exit the current interface or function

ENT Button: Confirm the selection

Up button: Move cursor to upside or increase value

Display the information of the inverter in this LCD screen

B

C

D

F

G
H

I

E

F

H
E

G

ENT

Main Interface displays the system working 

status and information, including:
• Power: Total AC output power

• Pload: Total load power.

• Battery: State of charge (SOC).

• offGridMode: Current working state of the 

equipment, including alarm type.

In the Main interface, press ENT key to enter the 

Menu. 

Power                                0W
Pload                         00.0kW

h

Battery                                 %

offGridMode

Setting
Information

Status
History

System status data
System historical data
System settings
System message

Main menu

3.2.2. Status

F

PInv

Uab/Ubc/Uca
Ia/Ib/Ic

Grid

Solar

Battery

The line voltage on the AC side of PCS
Phase current on the AC side of PCS
Frequency on the AC side of PCS
Output power on the AC side of PCS

U1
I1

PmAC

PmDC

Total power read by meter on grid side
Power read by meter on PV inverter side

PV1 current

PV1 voltage

I2
P2

P1

U2

PV1 power
PV2 voltage
PV2 current
PV2 power

I
P

Pm_dc
U

PV inverter output
Battery voltage
Battery current
Battery power

SOC
RelayL

Battery SOC
Relay status

Status

Содержание Storion-T100

Страница 1: ...pha ess de www alpha ess de Paul Ehrlich Straße 1a 63225 Langen Alpha ESS Australia Pty Ltd 61 1300 968 933 australia alpha ess com www alpha ess com au Unit 1 2 Ralph Street Alexandria NSW 2015 Alpha ESS Italy S r l 39 599 239 50 info alpha ess it www alpha ess it Via Loda 17 41013 Castelfranco Emilia MO Alpha ESS Korea Co Ltd 82 64 721 2004 korea alpha ess com 2F 19 4 Nohyeong 11 gil Jeju si Jej...

Страница 2: ...0 4 1 Check Before Operation 4 2 Power on Procedures 4 3 Power off Procedures 2 1 Keep the Manual 2 2 Operator Requirements 2 3 Protection of Warning Sign 2 4 Setting of Warning Sign for Safety 2 5 Live Line Measurement 2 6 Measuring Equipment 2 7 Electrostatic Prevention 2 8 Moisture Prevention 2 9 Operation after Power Failure 2 10 Minimum Personal Protective Equipment 17 EMS OPERATION 05 This ma...

Страница 3: ...tion 01 This manual applies for Storion T50 T100 Li ion battery energy storage system mainly includes 3 System installation Introduces the installation of T50 T100 including precautions 4 Routine maintenance Introduces items in maintenance of T50 T100 Li ion battery energy storage system including attentions 5 Troubleshooting Introduces the faults of T50 T100 Li ion battery energy storage system c...

Страница 4: ...tteries connected in series parallel in the pack with a battery management system BMS in which accesses to DC side of a bidirectional converter 2 1 Keep the Manual 2 2 Operator Requirements This manual contains important information about operating the system Before operating please read it very carefully The PCS should be operated in strict accordance with the description in the manual in case of...

Страница 5: ...than 95 Repairing or maintaining activities in wet conditions should be avoided or limited 2 8 Moisture Prevention 2 9 Operation after Power Failure The battery system belongs to energy storage system which maintains fatal high voltage even when the DC side is disconnected Therefore touching of the battery output is strictly prohibited The PCS maintains fatal voltage even when both the DC or AC si...

Страница 6: ...of the inverter in this LCD screen B C D F G H I E F H E G ENT Main Interface displays the system working status and information including Power Total AC output power Pload Total load power Battery State of charge SOC offGridMode Current working state of the equipment including alarm type In the Main interface press ENT key to enter the Menu Power 0W Pload 00 0kWh Battery offGridMode Setting Informa...

Страница 7: ...ibrate SOC Reserved Set the installed PV capacity of the grid con nected inverter if the PV inverter is controlla ble it is the total rated power of the PV inverter Set the installed PV capacity of the energy storage machine Setting Function Grid UPS System System Mode Pmeteroffset PmeterMax Peak Shave LowerLimit Enable Offset Start Time 1 End Time 1 Start Time 2 End Time 2 Peak ShaveEN UpperLimit S...

Страница 8: ...Work Mode Charge End Time 1 Charge Start Time 2 Charge Start Time 2 Set the charging end time of the first stage Set the charging start time of the second stage Set the charging start time of the second stage Set the upper limit of charging SOC Charge cut SOC DisCharge Start Time 1 DisCharge End Time 1 Set the discharge time of the first stage Set the first stage to stop the discharge time Set the lo...

Страница 9: ...o re power after setting Server IP Server Port Client IP English Deutsch Local Remote CtrlMode Protocol Scheduling device address Scheduling timeout 0 means unlimited time for EMS connection If the timeout is not set as 0 EMS will not be connected when the time is out Dev_addr EMS_timeout ComMode ModbusRTU ModbusTCP MSID No used Clear inverter power statistics Clear the energy statistics of the me...

Страница 10: ...tch turn it on C After the power is on the LED on the batteries and HV900112 starts flashing E If the battery status is correct turn on the battery and PV switches of the system by pushing up the switch handles The green indicator of the system starts flashing After 10 seconds the red indicator is on F Turn on the load switch and grid switch by pushing up switch handles D After waiting for about 2 m...

Страница 11: ...EMS Setting Function CT Meter Enable NO G Check the system mode is DC EMS Setting Function System Mode DC H Check the maximum charge power of system EMS Setting Function System Mode ChargePower Power 50kW 100kW I Set up the PV storage capacity EMS Setting Function Solar Enable Storage Cap J Set up the generator parameters a Open the generator EMS Setting Function Generator Enable YES b Check the g...

Страница 12: ... Enable YES G Check the meter ratio is correct EMS Setting Function CT Meter Ratio 80 H Check the system mode EMS Setting Function System Mode DC AC Hybrid I Check the maximum charge power of system EMS Setting Function System Mode ChargePower Power 50kW 100kW J Set up the discharge cut SOC of the system EMS Setting Function System Mode DischargeCutSOC 11 K Set up the PV storage capacity EMS Setti...

Страница 13: ...tion System Mode Discharge End Time 1 J Set up the second discharge start time EMS Setting Function System Mode Discharge Start Time 2 K Set up the second discharge end time EMS Setting Function System Mode Discharge End Time 2 L Set up the discharge cut SOC of the system EMS Setting Function System Mode DischargeCutSOC 11 D E F Plug Down button View the power in the viewing interface move right i...

Страница 14: ...ratio METER INSTRUCTION METER INSTRUCTION 22 23 1 Press SET and the screen shows PASS 2 Press ENT and the screen shows 0000 3 Input 0001 as the password and press ENT 4 Set the parameters 5 After settings press SET and the screen shows SAVE 6 Select YES and press ENT to save the settings Examples of display interface Table 4 Partial display interface diagram Current forward active energy 12 34kWh ...

Страница 15: ...s SET to enter SAVE press Enter to select Yes to save H The setting is over 001 EMERGENCY STOP INSTALLATION 24 25 Emergency Stop 07 When the energy storage system is abnormal you can press the emergency stop button EPO on the cabinet door and then follow the step A to E in 4 3 to power it off In order to prevent personal casualty if you want to repair or open the machine after power off please measu...

Страница 16: ...ccording to your own situation Then Click SIGN UP NOW to go to the login page More detailed information can be obtained in Online Monitoring Web server installation Manual Register E mail Contact Number Username Country Region City Town Province State Password Confirm Password Language E mail Contact Person Time Zone Address Zip Code Contact Number User Type S N Sign up Now Back Imprint Privacy Pol...

Страница 17: ...tain the equipment by observing the status of the equipment indicator lights and software monitoring information Check items Check content Time Notes Indicator light 1 Battery Inspection requirements Once 6 months EMS display There is nothing wrong with the EMS display when the system is operating normally The fault light goes out and the interface displays On Grid Mode Flashing green light Once 6...

Страница 18: ...er outage inspection maintenance work etc Check items Check content Time Notes 1 Battery Inspection requirements Check whether the wiring harness between batteries is tightly locked Connection between batteries Connection between the battery and highvoltage control box Once 6 months Check whether the wiring harness between the Battery and the highvoltage control box is locked All locked not loose ...

Страница 19: ...ould be in good electrical connection with the surface of the battery rack and the grounding point use a multimeter to test the conduction state Check whether the ground wire of the battery rack is well connected Once 6 months Once 6 months Once 6 months Check whether the appearance of all batteries and high voltage control boxes in the system is normal The battery rack is well fixed The battery ra...

Страница 20: ...wer off Check if the inverter is damaged or deformed Operating status Environment Check whether the inverter makes abnormal noises during operation Check whether all components are normal during the operation of the inverter Check the temperature of the inverter shell and use a thermal imager to monitor the temperature of the system Check whether the air inlet outlet is normal Check the humidity an...

Страница 21: ...l positive and the ground and the total negative and the ground of the junction cabinet should be 5MΩ Once 6 months Once 6 months Once 6 months Once 6 months Once 6 months Once 6 months Whether the grounding resistance of the battery high voltage box and cabinet is within a reasonable range PCS live part screws collection wiring harness communication wiring harness inspection Use the multimeter to...

Страница 22: ...e of the loads to check if the fault is eliminated If the problem is not resolved stop any operation on the system and contact AlphaESS customer service Pole Ov Temp Pole over temperature fault Shut down the system for about 2 hours then restart the system to see if the fault is eliminated If the problem is not resolved please contact AlphaESS customer service Cell Ov Volt Cell over volt fault Res...

Страница 23: ...he problem is not resolved please contact AlphaESS customer service PV Meter Lost PV Meter Lost Check if the communication cable between the PV side meter and the GRID meter is connected If the problem is not resolved please contact AlphaESS customer service SD Lost SD Lost Restart the system to check if the fault is eliminated If the problem is not resolved please contact AlphaESS customer servic...

Страница 24: ... phase loss in the AC input of the inverter If there is a phase loss please power off and reconnect the cable If the problem is not resolved please contact AlphaESS customer service off_grid_UPLF DC AC subsystem off grid voltage phase lost Fault Check if there is phase loss in the AC input of the inverter If there is a phase loss please power off and reconnect the cable If the problem is not resolved ...

Отзывы: