(5) Storage unit
A combination of a bidirectional converter and a battery system unit, which can be used
as an independent load or be controlled directly by monitoring system.
NOTE:
To ensure optimal reliability and to meet warranty requirements, the Energy
Storage System must be installed according to the instructions in this manual.
NOTE:
(1) If the installer leaves the site, but the system during debugging
should be shut down in time, including batteries and PCS.
(2) When the system fails, please refer to the troubleshooting table to solve the
problem first. If the problem cannot be solved, please contact AlphaESS
engineers. If you cannot contact the engineers in time, please shut down the
system.
If the equipment is damaged due to unauthorized operation or without following the
above precautions, it will not be covered by the warranty.
(3) Battery management system
Electronic equipment collection for monitoring the operating information of cells, packs
and system units (such as voltage, current, temperature, protective parameter of
batteries), evaluating the state of charge (SOC), the state of health (SOH) and cumulative
processed energy and protecting batteries for safety, etc.
(4) Battery system unit
Batteries connected in series/parallel in the pack with a battery management system
(BMS) in which accesses to DC side of a bidirectional converter .
2.1 Keep the Manual
2.2 Operator Requirements
This manual contains important information about operating the system. Before
operating, please read it very carefully.
The PCS should be operated in strict accordance with the description in the manual, in
case of the damage or loss to equipment, personnel and property.
This manual should be kept carefully for maintenance and reparation.
The operators should get a professional qualification, or be trained by qualified person.
The operators should be familiar with the whole storage system, including compositions
and working principles of the system.
The operators should be familiar with the Product Instruction.
While carrying out maintenance work it has to be at least two operators in the field all
the time. They can’ t operate on any equipment until they are all powered off and fully
discharged.
It is strictly prohibited for any maintenance operation when equipment is on or charged.
2.3 Protection of Warning Sign
The warning sign contains important information for the system to operate safely and it is
strictly prohibited to be torn or damaged.
Ensure that the warning sign is always clear.
The signs should be replaced immediately if damaged.
Safety Instructions
02
SAFETY INSTRUCTIONS
INTRODUCTION
02
03