___________________________________________________________________
Alpha ESS Co., Ltd.
Page 20
Your Smart Energy
Installation
gaskets.
Figure 18 Battery Installation – Second Battery Installation
Step 8:
To assemble the second (and all other) battery, repeat steps 6 and 7,
respectively.
Figure 19 Wall Bracket Installation
Step 9:
Take out the inverter position plate and the wall bracket and connect them
using the M4 nuts as shown above. Check carefully if everything is tight.