___________________________________________________________________
Alpha ESS Co., Ltd.
Page 16
Your Smart Energy
Installation
2.2
Installation
Figure 10 Unpacking the inverter and battery
Step 1
: Remove the battery and inverter from the packaging box.
2.2.1
Battery Installation
Figure 11 Battery with Lid off - Front View
Figure 12 Battery with Lid off – Side View
Step 2
: Open the front cover of the battery and remove the communication wiring
cover (each battery has such a cover on the left and right sides of the case.). Set the
covers aside and close the case.
NOTE: The front cover of the battery should not be opened more than 90°
Communication
wiring baffle