![Allstar Gate Star 6000 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/allstar/gate-star-6000/gate-star-6000_installation-and-owners-manual_2904013017.webp)
With Switch S3 in the ON position terminals 6 & 7 (OPEN &
CLOSE) are in the Secondary mode and could be coupled to and
would be controlled by a Primary control board (box). With Switch
S3 in the OFF position terminals 14 & 15 are in the Primary (output)
mode and could be coupled to and would control a Secondary
control board (box).
APPLYING POWER TO THE GS6000
PRE-POWER CHECK LIST
Before applying power to the GS6000 for the first time, go through
the following check list to ensure that all is in order for the
application of power.
1. Check that the GS6000 power switch is off.
2. Check that the breaker at the power panel is on.
D:
STARTING THE OPERATOR
17
111993
Figure 20: Wiring Diagram