7.0 Install / Uninstall Ho-Pac
IMPORTANT
Collect fluids in a suitable container. Clean up spilled
fluids and obey all local regulations for the disposal
of these fluids.
IMPORTANT
Attached to the mounting frame is the control valve.
In addition to the part number stamped on the valve
body, the connection ports are stamped P1, P2, T1
and T2. The supply hose is tagged with a red colored
cable tie marked ‘PRESSURE’.
Fig. 7-1 Hose Connections Identified
1. Connect Supply [IN] and Return [OUT] hoses to
carrier’s hydraulic circuit.
2. Raise the Skid-Pac off the ground and operate
the bucket cylinder to ensure hoses will not be
pinched or restricted.
Fig. 7-2 Check hose length for unrestricted
movement & routing for pinching or chafing
3. Briefly test Skid-Pac for proper operation. Stop
and check for hydraulic leaks. Tighten hoses and
connections as necessary.
IMPORTANT
The installation is not complete until the hydraulic
circuit is tested for flow and pressure. Tools
required for testing include a flow meter and
pressure gages. Procedures, along with a form to
record test results, are found in the Technical Data
section of this manual. Questions regarding test
results or procedures should be directed to Allied
Technical Service.
7.3 Removal of Skid-Pac From Carrier
CAUTION
Some procedures may require an assistant. Both
the operator and assistant must be qualified in these
procedures. All directions and signals must be
agreed upon in advance. Take signals from only one
person.
CAUTION
Hot surface - Burn injury if contacted.
Some components of the machinery
become hot during operation. Allow parts
and fluids to cool before handling.
CAUTION
Fluid penetration hazard. Release
pressure trapped in hoses before
disconnecting. Wear appropriate
protective equipment including safety
eyewear and gloves.
IMPORTANT
Collect fluids in a suitable container. Clean up
spilled fluids and obey all local regulations for the
disposal of these fluids.
1. Position Skid-Pac on stable ground.
2. Disconnect hydraulic connections.
3. With loads adequately supported, disengage
Skid-Pac from mounting coupler.