18. Remove screws along vestibule sides and bottom which
secure vestibule panel and heat exchanger assembly
to cabinet. Remove two screws from blower rail which
secure bottom heat exchanger flange. Remove heat
exchanger from furnace cabinet.
19. Back wash heat exchanger with soapy water solution or
steam. If steam is used it must be below 275°F (135°C).
20. Thoroughly rinse and drain the heat exchanger. Soap
solutions can be corrosive. Take care to rinse entire
assembly.
21. Reinstall heat exchanger into cabinet making sure that
the clamshells of the heat exchanger assembly are
resting on the support located at the rear of the cabinet.
Remove the indoor blower to view this area through the
blower opening.
22. Re-secure the supporting screws along the vestibule
sides and bottom to the cabinet.
23. Reinstall cabinet screws on front flange at blower deck.
24. Reinstall the primary limit on the vestibule panel.
25. Route heating component wiring through hole in blower
deck and reinsert strain relief bushing.
26. Reinstall electrical junction box.
27. Reinstall the combustion air inducer. Reconnect the 4
pin plug to the wire harness.
28. Reinstall pressure switches and reconnect pressure
switch wiring.
29. Carefully connect combustion air pressure switch hosing
from pressure switches to proper stubs on cold end
header collector box.
30. Reconnect condensate drain line to the cold end header
box.
31. Use securing screws to reinstall flue collar to the top
cap on the furnace. Reconnect exhaust piping and
exhaust drain tubing.
32. Replace flexible exhaust adapter on combustion air
inducer and flue collar. Secure using two existing hose
clamps.
33. Reinstall burner box assembly in vestibule area.
34. Reconnect flame roll-out switch wires.
35. Reconnect sensor wire and reconnect 2 pin plug from
ignitor.
36. Secure burner box assembly to vestibule panel using
four existing screws. Make sure burners line up in center
of burner ports.
37. Reinstall gas valve manifold assembly. Reconnect gas
supply line to gas valve.
38. Reinstall burner box cover.
39. Reconnect 2 pin plug to gas valve.
40. Replace the blower compartment access panel.
41. Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
42. Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
43. Replace heating compartment access panel.
Cleaning the Burner Assembly
1.
Turn off electrical and gas power supplies to furnace.
Remove upper and lower furnace access panels.
2.
Disconnect the 2 pin plug from the gas valve.
3.
Remove the burner box cover.
4.
Disconnect the gas supply line from the gas valve.
Remove gas valve/manifold assembly.
5.
Mark and disconnect sensor wire from the sensor.
Disconnect wires from flame rollout switches.
6.
Remove four screws which secure burner box assembly
to vest panel. Remove burner box from the unit.
7.
Use the soft brush attachment on a vacuum cleaner to
gently clean the face of the burners. Visually inspect
the inside of the burners and crossovers for any blockage
caused by foreign matter. Remove any blockage.
8.
Reinstall the burner box assembly using the existing four
screws. Make sure that the burners line up in the center
of the burner ports.
9.
Reconnect the sensor wire and reconnect the 2 pin plug
to the ignitor wiring harness. Reconnect wires to flame
rollout switches.
10. Reinstall the gas valve manifold assembly. Reconnect
the gas supply line to the gas valve. Reinstall the burner
box cover.
11. Reconnect 2 pin plug to gas valve.
12. Replace the blower compartment access panel.
13. Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
14. Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
15. Replace heating compartment access panel.
Содержание A97USMV
Страница 3: ...506887 01 Page 3 of 78 Issue 1213 A97USMV Exploded View Figure 1 ...
Страница 16: ...506887 01 Page 16 of 78 Issue 1213 Figure 17 ...
Страница 28: ...506887 01 Page 28 of 78 Issue 1213 Trap Drain Assembly using 1 2 PVC or 3 4 PVC Figure 38 ...
Страница 35: ...506887 01 Page 35 of 78 Issue 1213 ...
Страница 36: ...506887 01 Page 36 of 78 Issue 1213 Figure 46 ...
Страница 39: ...506887 01 Page 39 of 78 Issue 1213 ...
Страница 40: ...506887 01 Page 40 of 78 Issue 1213 Typical A97USMV Wiring Diagram Figure 47 ...
Страница 41: ...506887 01 Page 41 of 78 Issue 1213 Integrated Control Figure 48 ...
Страница 42: ...506887 01 Page 42 of 78 Issue 1213 Low Voltage Field Wiring Table 14 2 Stage Single Stage ...
Страница 46: ...506887 01 Page 46 of 78 Issue 1213 BLOWER DATA ...
Страница 47: ...506887 01 Page 47 of 78 Issue 1213 BLOWER DATA ...
Страница 48: ...506887 01 Page 48 of 78 Issue 1213 BLOWER DATA ...
Страница 49: ...506887 01 Page 49 of 78 Issue 1213 BLOWER DATA ...
Страница 50: ...506887 01 Page 50 of 78 Issue 1213 BLOWER DATA ...
Страница 51: ...506887 01 Page 51 of 78 Issue 1213 BLOWER DATA ...
Страница 52: ...506887 01 Page 52 of 78 Issue 1213 BLOWER DATA ...
Страница 53: ...506887 01 Page 53 of 78 Issue 1213 BLOWER DATA ...
Страница 54: ...506887 01 Page 54 of 78 Issue 1213 BLOWER DATA ...
Страница 55: ...506887 01 Page 55 of 78 Issue 1213 TABLE 22 ...
Страница 56: ...506887 01 Page 56 of 78 Issue 1213 TABLE 23 ...
Страница 60: ...506887 01 Page 60 of 78 Issue 1213 Figure 50 ...
Страница 68: ...506887 01 Page 68 of 78 Issue 1213 ...
Страница 69: ...506887 01 Page 69 of 78 Issue 1213 ...
Страница 70: ...506887 01 Page 70 of 78 Issue 1213 ...
Страница 75: ...506887 01 Page 75 of 78 Issue 1213 Troubleshooting Cooling Sequence of Operation Call for Cooling ...