506887-01
Page 13 of 78
Issue 1213
Joint Cementing Procedure
All cementing of joints should be done according to the
specifications outlined in ASTM D2855.
1.
Measure and cut vent pipe to desired length.
2.
Debur and chamfer end of pipe, removing any ridges or
rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
3.
Clean and dry surfaces to be joined.
4.
Test fit joint and mark depth of fitting on outside of pipe.
5.
Uniformly apply a liberal coat of PVC primer for PVC or
use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
6.
Promptly apply solvent cement to end of pipe and inside
socket surface of fitting. Cement should be applied
lightly but uniformly to inside of socket. Take care to
keep excess cement out of socket. Apply second coat
to end of pipe.
NOTE:
Time is critical at this stage. Do not allow primer to
dry before applying cement.
7.
Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn during
assembly (but not after pipe is fully inserted) to distribute
cement evenly.
DO NOT
turn ABS or cellular core pipe.
NOTE:
Assembly should be completed within 20 seconds
after last application of cement. Hammer blows should not
be used when inserting pipe.
8.
After assembly, wipe excess cement from pipe at end
of fitting socket. A properly made joint will show a bead
around its entire preimeter. Any gaps may indicate a
defective asembly due to insufficient solvent.
9.
Handle joints carefully until completely set.
OUTDOOR TERMINATION KITS USAGE
Table 3
Содержание A97USMV
Страница 3: ...506887 01 Page 3 of 78 Issue 1213 A97USMV Exploded View Figure 1 ...
Страница 16: ...506887 01 Page 16 of 78 Issue 1213 Figure 17 ...
Страница 28: ...506887 01 Page 28 of 78 Issue 1213 Trap Drain Assembly using 1 2 PVC or 3 4 PVC Figure 38 ...
Страница 35: ...506887 01 Page 35 of 78 Issue 1213 ...
Страница 36: ...506887 01 Page 36 of 78 Issue 1213 Figure 46 ...
Страница 39: ...506887 01 Page 39 of 78 Issue 1213 ...
Страница 40: ...506887 01 Page 40 of 78 Issue 1213 Typical A97USMV Wiring Diagram Figure 47 ...
Страница 41: ...506887 01 Page 41 of 78 Issue 1213 Integrated Control Figure 48 ...
Страница 42: ...506887 01 Page 42 of 78 Issue 1213 Low Voltage Field Wiring Table 14 2 Stage Single Stage ...
Страница 46: ...506887 01 Page 46 of 78 Issue 1213 BLOWER DATA ...
Страница 47: ...506887 01 Page 47 of 78 Issue 1213 BLOWER DATA ...
Страница 48: ...506887 01 Page 48 of 78 Issue 1213 BLOWER DATA ...
Страница 49: ...506887 01 Page 49 of 78 Issue 1213 BLOWER DATA ...
Страница 50: ...506887 01 Page 50 of 78 Issue 1213 BLOWER DATA ...
Страница 51: ...506887 01 Page 51 of 78 Issue 1213 BLOWER DATA ...
Страница 52: ...506887 01 Page 52 of 78 Issue 1213 BLOWER DATA ...
Страница 53: ...506887 01 Page 53 of 78 Issue 1213 BLOWER DATA ...
Страница 54: ...506887 01 Page 54 of 78 Issue 1213 BLOWER DATA ...
Страница 55: ...506887 01 Page 55 of 78 Issue 1213 TABLE 22 ...
Страница 56: ...506887 01 Page 56 of 78 Issue 1213 TABLE 23 ...
Страница 60: ...506887 01 Page 60 of 78 Issue 1213 Figure 50 ...
Страница 68: ...506887 01 Page 68 of 78 Issue 1213 ...
Страница 69: ...506887 01 Page 69 of 78 Issue 1213 ...
Страница 70: ...506887 01 Page 70 of 78 Issue 1213 ...
Страница 75: ...506887 01 Page 75 of 78 Issue 1213 Troubleshooting Cooling Sequence of Operation Call for Cooling ...