5.
If second-stage heat is required, the thermostat second
stage heat contacts close and send a signal to the
integrated control. The integrated control either
increases the firing rate to 70 percent (if the current rate
is at or below 60 percent) or increases the firing rate by
10 percent (if the current rate is above 60 percent). If
the call for heat continues 5 minutes beyond this initial
upstage, the rate will be increased by 10 percent every
5 minutes until the call for heat is satisfied or the furnace
reaches 100 percent rate. As the firing rate increases,
the indoor blower motor is adjusted to a speed which is
appropriate for the target rate.
6.
If second-stage heat demand is satisfied, but first stage
is still present, the furnace will continue to operate at
the present firing rate until the heat cycle ends.
7.
When the demand for first and second stage heat is
satisfied, the gas valve is de-energized and the
fieldselected indoor blower off delay begins. The
combustion air inducer begins a 20 second post-purge
period.
8.
When the combustion air post purge period is complete,
the inducer is de-energized. The indoor blower is de-
energized at the end of the off delay.
Applications Using A Single-Stage Thermostat
C - Heating Sequence -- Control Thermostat Selection
DIP switch in "Single Stage" Position
1.
On a call for heat, thermostat first stage contacts close
sending a signal to the integrated control. The integrated
control runs a self-diagnostic program and checks high
temperature limit switches for normally closed contacts
and pressure switches for normally open contacts. The
combustion air inducer is energized at the ignition speed,
which is approximately the same as the inducer speed
at 70 percent firing rate.
2.
Once the control receives a signal that the low fire
pressure switch has closed, the combustion air inducer
begins a 15 second prepurge at the ignition speed.
3.
After the prepurge is complete, a 20 second initial ignitor
warm up period begins. The combustion air inducer
continues to operate at the ignition speed.
4.
After the 20 second warm up period has ended, the gas
valve is energized and ignition occurs, which initiates a
10 second ignition stabilization delay. At the same time,
the control module sends a signal to begin an indoor
blower 30 second
ON
delay. When the delay ends, the
indoor blower motor is energized at a speed which is
appropriate for the firing rate. After the 10 second ignition
stabilization delay expires, the inducer speed is adjusted
to 40 percent speed. The integrated control also initiates
a second-stage on delay (factory set at 7 minutes;
adjustable to 12 minutes).
5.
If the heating demand continues beyond the
secondstage on delay, the integrated control energizes
the combustion air inducer at 70 percent speed. The
indoor blower motor is adjusted to a speed which
matches the target rate. A fixed, 10 minute third stage
on delay is initiated.
6.
If the heating demand continues beyond the thirdstage
on delay, the integrated control energizes the inducer at
high speed. The indoor blower motor is adjusted to a
speed which is appropriate for the target rate.
7.
When the thermostat heating demand is satisfied, the
gas valve is de-energized and the combustion air inducer
begins a 20 second post purge. The field selected indoor
blower off delay begins.
8.
When the combustion air post purge period is complete,
the inducer is de-energized. The indoor blower is de-
energized at the end of the off delay.
Содержание A97USMV
Страница 3: ...506887 01 Page 3 of 78 Issue 1213 A97USMV Exploded View Figure 1 ...
Страница 16: ...506887 01 Page 16 of 78 Issue 1213 Figure 17 ...
Страница 28: ...506887 01 Page 28 of 78 Issue 1213 Trap Drain Assembly using 1 2 PVC or 3 4 PVC Figure 38 ...
Страница 35: ...506887 01 Page 35 of 78 Issue 1213 ...
Страница 36: ...506887 01 Page 36 of 78 Issue 1213 Figure 46 ...
Страница 39: ...506887 01 Page 39 of 78 Issue 1213 ...
Страница 40: ...506887 01 Page 40 of 78 Issue 1213 Typical A97USMV Wiring Diagram Figure 47 ...
Страница 41: ...506887 01 Page 41 of 78 Issue 1213 Integrated Control Figure 48 ...
Страница 42: ...506887 01 Page 42 of 78 Issue 1213 Low Voltage Field Wiring Table 14 2 Stage Single Stage ...
Страница 46: ...506887 01 Page 46 of 78 Issue 1213 BLOWER DATA ...
Страница 47: ...506887 01 Page 47 of 78 Issue 1213 BLOWER DATA ...
Страница 48: ...506887 01 Page 48 of 78 Issue 1213 BLOWER DATA ...
Страница 49: ...506887 01 Page 49 of 78 Issue 1213 BLOWER DATA ...
Страница 50: ...506887 01 Page 50 of 78 Issue 1213 BLOWER DATA ...
Страница 51: ...506887 01 Page 51 of 78 Issue 1213 BLOWER DATA ...
Страница 52: ...506887 01 Page 52 of 78 Issue 1213 BLOWER DATA ...
Страница 53: ...506887 01 Page 53 of 78 Issue 1213 BLOWER DATA ...
Страница 54: ...506887 01 Page 54 of 78 Issue 1213 BLOWER DATA ...
Страница 55: ...506887 01 Page 55 of 78 Issue 1213 TABLE 22 ...
Страница 56: ...506887 01 Page 56 of 78 Issue 1213 TABLE 23 ...
Страница 60: ...506887 01 Page 60 of 78 Issue 1213 Figure 50 ...
Страница 68: ...506887 01 Page 68 of 78 Issue 1213 ...
Страница 69: ...506887 01 Page 69 of 78 Issue 1213 ...
Страница 70: ...506887 01 Page 70 of 78 Issue 1213 ...
Страница 75: ...506887 01 Page 75 of 78 Issue 1213 Troubleshooting Cooling Sequence of Operation Call for Cooling ...