Chapter 5: Installing the Switch in an Equipment Rack
122
You can use the different sets of holes on the switch to install the switch in
the equipment rack in a variety of orientations. You can install it with the
front panel flush with, extending in front of, or recessed behind the front of
the equipment rack. Refer to Figure 65.
Figure 65. Switch Orientations in an Equipment Rack
Installing the
Switch
If you have not chosen an orientation for the switch in the equipment rack,
review “Switch Orientations in the Equipment Rack” on page 121.
Please review the installation guidelines in “Choosing a Site for the
Switch” on page 95 before installing the switch in an equipment rack.
Caution
The chassis can be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.
E28
Содержание x530L Series
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 56: ...Chapter 1 Overview 56 ...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60 When using a multi speed port as a stack port it supports 1 to 8 links ...
Страница 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Страница 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Страница 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...
Страница 210: ...Chapter 9 Cabling the Networking Ports 210 ...
Страница 228: ...Appendix A Technical Specifications 228 ...