107
Chapter 5
Installing the Switch in an Equipment
Rack
This chapter provides instructions for installing the switch in an equipment
rack, and contains the following sections:
“Overview of Installing the x530L-10GHXm Switch in an Equipment
Rack” on page 108
“Installing the x530L-10GHXm Switch in an Equipment Rack with the
RKMT-J14 Brackets” on page 110
“Installing the x530L-10GHXm Switch in an Equipment Rack with the
RKMT-J15 Bracket” on page 115
Содержание x530L Series
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 56: ...Chapter 1 Overview 56 ...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60 When using a multi speed port as a stack port it supports 1 to 8 links ...
Страница 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Страница 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Страница 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...
Страница 210: ...Chapter 9 Cabling the Networking Ports 210 ...
Страница 228: ...Appendix A Technical Specifications 228 ...