© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
70458101 (EN)
20
Figure 2
TMB2020N
NOTE: Shaded areas indicate adjacent structure.
1
13 mm (0.5 in.) recommended between machines for removal or installation
2
Allow 51-102 mm (2-4 in.) opening at top of machine to aid in removal or installation. A removable trim piece
may be used to conceal the opening; zero clearance allowed for trim
3
102 mm (4 in.) maximum header thickness
4
Minimum clearance permitted for remainder: Gas and Electric 102 mm (4 in.), Steam 305 mm (12 in.)
5
Guard
6
Provision for make-up air
7
610 mm (24 in.) minimum, 914 mm (36 in.) recommended for maintenance purposes
8
6 mm (0.25 in.) recommended for removal or installation purposes, zero clearance allowed
TMB2020N
3
1
4
5
6
7
2
WARNING
To reduce the risk of severe injury, clearance of tumbler cabinet from combustible
construction must conform to the minimum clearances, and/or local codes and
ordinances.
W770
8