![ALLIANCE YU120E Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/alliance/yu120e/yu120e_installation-operation-and-maintenance-manual_2901134035.webp)
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Exhaust Requirements
33
70458101 (EN)
Figure 12
NOTE: Do not install wire mesh or screen in
exhaust duct opening to avoid lint build-up or
impacting proper discharge of air from tumble
dryers.
NOTE: Where exhaust duct pierces a combustible
wall or ceiling, the opening must be sized per local
codes.
NOTE: Inside of duct must be smooth. Do not use
sheet metal screws to join sections.
Consult your local building code for regulations which
may also apply.
1
Removable strip of panel in framing wall to permit removal of tumble dryer from framing wall
2
Partition or bulkhead
3
Minimum distance between exhaust opening and roof, ground or other obstruction: 914 mm (36 in.)
4
51 mm (2 in.) minimum clearance on both sides of duct
5
Exhaust airflow – maximum length of rigid duct 4.3 m (14 ft.) or 2.4 m (7.87 ft.) of flexible metal duct
TMB2361N
TMB2362N
TMB2360N
1
2
3
4
5
1
2
4
5
1
2
5
3
4
OR
OR
TMB2361N
TMB2362N
TMB2360N