Start-up Procedure
Before Starting Procedures
Before operation each day check for the following:
1. All guards, side screens and panels are in place
2. All safety and information signs are in place and legible
3. Engine, Gearbox, and Hydraulic Oil levels are correct.
4. Fuel level in fuel tank.
5. Check the battery level
6. Condition of air filter on engine.
7. Condition of riding trowel arms and blades.
8. Verify that daily maintenance of grease points have been performed.
9. Check operating controls for proper operation and adjustment
10. Check speed control operation before and after starting engine for proper operation
11. Check the steering left and right, for proper operation
12. Check for any hydraulic leaks
13. Remove any loose objects that could interfere with the operation of the trowel
Note:
If there is any indication that faulty equipment exists, shutdown safely, inform the proper
authority and
DO NOT
operate the riding trowel until the problem has been fixed.
Starting Procedures
Turn ignition switch key to the start-position, immediately release key when engine starts. Allow engine to
warm up for 5 minutes before operating riding trowel.
Operating the starter for more than 5 seconds can damage the starter or
engine. If engine fails to start release the switch and wait 15 seconds before
operating starter again.
SECTION 2
OPERATIONS
069583
Page 29
Содержание MSP475
Страница 6: ...069583 Page 6 GENERAL INFORMATION CE Declaration ...
Страница 12: ...Dimensions mm in 069583 Page 12 GENERAL INFORMATION Engine Specifications ...
Страница 14: ...SECTION 1 SAFETY SECTION 1 SAFETY 069583 Page 14 ...
Страница 27: ...SECTION 2 OPERATION SECTION 2 OPERATIONS 069583 Page 27 ...
Страница 39: ...SECTION 3 SERVICE 069583 Page 39 SECTION 3 SERVICE ...
Страница 50: ...SECTION 4 ACCESSORIES SECTION 4 ACCESSORIES 069583 Page 50 ...