This section details the proper technique to utilize the Dolly Jack system in a safe
manner to install concrete finishing pans.
(NOTE: Images are for illustration purposes only)
Use the appropiate set of lifting jacks that are designed for the machine you are lifting.
[See section "ACCESORIES" for appropriate dolly jack part number]
1. Attach the front and rear dolly jacks into the machine at the receiving
tube locations.
2. Slowly lift the machine in a safe manner to a height that is required to
safely install the pans. This is typically 6"-8" above floor level.
3. Carefully slide the pans under the machine, making sure that you are
aware of the corners of the blades as they are sharp.
4. Align the pans so that the clips will not be crushed when the machine is
lowered back down.
5. Slowly lower the machine down onto the pans. Make sure the blades
are going into the proper gaps. (Typically the pans can only be installed
one way)
6. Remove the dolly jacks from the machine
7. Start the machine and slowly increase the throttle until the blades begin
turning and engaging the pans. The machine is now ready to finish the
concrete utilizing the pans.
NOTE
: Utilizing the lifting sling(bridle) and the dolly jacks are intended only
for site transportation and the installation of pans and blades. DO NOT use
them for regular maintenance without the additional use of jack stands to
insure stability of the machine.
SECTION 1
SAFETY
069583
Page 25
Pan Installation Safety
Lifting Jacks
Содержание MSP475
Страница 6: ...069583 Page 6 GENERAL INFORMATION CE Declaration ...
Страница 12: ...Dimensions mm in 069583 Page 12 GENERAL INFORMATION Engine Specifications ...
Страница 14: ...SECTION 1 SAFETY SECTION 1 SAFETY 069583 Page 14 ...
Страница 27: ...SECTION 2 OPERATION SECTION 2 OPERATIONS 069583 Page 27 ...
Страница 39: ...SECTION 3 SERVICE 069583 Page 39 SECTION 3 SERVICE ...
Страница 50: ...SECTION 4 ACCESSORIES SECTION 4 ACCESSORIES 069583 Page 50 ...