6
Hardware Used
5. Fixture must be properly grounded. Connect fixture ground wire
to ground wire in electrical box using a wire nut (EE). Ground wires
can be either green or bare copper. Connect black supply lead to black
fixture wire and white supply lead to white fixture wire using
wire nuts (EE). Secure the wire nuts properly to prevent the wires from
coming loose. Use cable ties (FF) to secure loose fixture wires to one
another in the center of the mounting plate to keep them from getting
in the way during fixture mounting. Push excess wire back into the
electrical box.
6. Keeping the support wire (B) hooks attached to the mounting plate
(A), lift up the LED panel (C), being careful not to scratch ceiling. Align
and insert the 2 metal tabs (on the same side of the mounting plate (A)
as the support wires) into the corresponding slots on the LED panel (C).
7. While keeping the first 2 metal tabs inserted, pivot the panel (C) up
and insert the 2 remaining tabs on the opposite side.
EE
FF
Wire Nut
Qty. 3
Cable tie Qty. 2
5
6
7
EE
EE
EE
C
C
A
B
Hot
Neutral
Ground
EE