
Rockwell Automation Publication 8720MC-RM001K-EN-P - September 2018
73
Chapter
6
8720MC-RPS Startup and Operation
This chapter provides a description of the operation panel and how to power-
up and operate the 8720MC-RPS regenerative power supply.
Topic
Page
ATTENTION:
Only qualified electrical personnel familiar with the
construction and operation of this equipment and the hazards involved
should install, adjust, operate, or service this equipment. Read and
understand this manual in its entirety before proceeding. Failure to observe
this precaution could result in damage to equipment, severe bodily injury, or
loss of life.
ATTENTION:
DC-bus capacitors retain hazardous voltages after input power
has been disconnected. After disconnecting power, wait five minutes for the
DC-bus capacitors to discharge and then check the voltage with a voltmeter
to make sure the DC-bus capacitors are discharged before touching any
internal components. Failure to observe this precaution could result in severe
bodily injury or loss of life.
ATTENTION:
Make sure that the input disconnect (breaker) is in the correct
position either ON or OFF depending on the work to be performed. Failure to
observe this precaution could result in severe bodily injury or loss of life.
ATTENTION:
A back up technician must be in line of sight when this work is
being performed, to assist in case of emergency. Failure to observe this
precaution could result in severe bodily injury or loss of life.