Installation
Algas-SDI Operation and Maintenance Manual
– P/N – 52642
2-9
Figure 4
– Filtaire Operation
1ST STAGE
REGULATOR
VAPOR FROM
VAPORIZER
INLET VALVE
2
VAPOR LINE
“FILTAIRE” OIL DEMISTER
OUTLET VALVE
BY PASS VALVE
(NORMALLY CLOSED)
3
1
5
DRAIN
VALVE
PIPE
STAND
6
4
VAPOR
TO LOAD
To properly size the FILTAIRE
TM
contact Algas-SDI with total connected load and
high pressure (first stage) regulator setting.
INSTALLING MULTIPLE UNITS IN PARALLEL
For balanced performance of the system, piping should have equal
distance from the main liquid line to each vaporizer inlet and from the
outlet of each vaporizer to the main vapor distribution line.
Only same
model vaporizers shall be manifolded and installed together.
Figure 5
– Installing Multiple Units in Parallel
Содержание Direct Fired 120/60H
Страница 4: ...This page left intentionally blank...
Страница 6: ...This page left intentionally blank...
Страница 9: ...This page left intentionally blank...
Страница 42: ...APPENDIX A TECHNICAL INFORMATION...
Страница 43: ...Figure 13 40 40H Vaporizer Replacement Parts 1 2 3 4 5 6 10 8 9 11 12 13 14 15 16 24...
Страница 55: ......