background image

 

 

If the adjacent walls and flooring are made of materials that are not heat-resistant, it is necessary to ensure adequate 
protection and use of non-combustible insulation material.  

To protect the flooring from combustible materials, it is mandatory to insert a metal plate that is 3 to 4 mm thick with the 

front side at least 30 cm greater than the depth of the boiler, under the boiler. The pellet boiler must be installed in 

accordance with the sketch, which defines the distance from the walls (Figure 2)                                           

 

Figure 2. The minimum distance of the boiler from the walls 

 
If the pellet boiler is installed in the boiler room where there are other devices that suck the air (other boilers, various 
types of suction fans, etc.), make sure that the volume of air entering the premise is sufficient to guarantee safe 
operation of the boiler.  
If the chimney passes through the ceiling it must be sufficiently insulated with coating of non-flammable insulation 
material.  
After the pellet boiler is set in place, level it (bring it to a horizontal position) with adjustable legs.  
 

 

The flue gas exhaust system MUST NOT BE CONNECTED TO: 

-

 

the uptake used by other heating devices (boilers, furnaces, fireplaces, etc.), 

-

 

the system for air extraction (from the hood, suction fan, etc.). 

 

     

 

       

It is prohibited to install barriers for the regulation of the flow of flue gases! 

The connector of the Ø80 mm flue pipe from the pellet boiler to the chimney should have the following characteristics: 
       

-

 

total length of up to 5 m (in the case of the connector of greater length connecting pipes diameter should be 

increased to Ø130 mm), 

-

 

each elbow of 90˚ reduces the total length of the flue pipe by 1 m, 

-

 

cover intended for cleaning should be located on each elbow, 

-

 

pipe joints need to be sealed. 

 

     

 

 
In case the resistance in the exhaust system is too high (numerous elbows, inappropriate   terminations, bottlenecks 
etc.), the flue gas exhaust is not guaranteed and it is necessary to increase the connecting pipes and elbows to greater 
dimensions, i.e. to Ø130 mm. Also, when the chimney does not provide proper flue gas exhaust, it may cause 
malfunction and consequently alarm activation in the GRANDE boiler. It is recommended that the chimney is inspected 
by a professional person before installation of the GRANDE Boiler. 
The system for discharging flue gases from the boiler functions at the underpressure generated in the combustion 
chamber and the faint pressure in the Ø80 mm flue pipe. Therefore, care should be taken to provide complete tightness of 
the flue pipe. 
It is necessary to carefully analyze the position and condition of the area through which the chimney passes. If the flue 
pipe passes through the wall and/or roof it should be suitably insulated in accordance with the safety regulations for fire 
protection.  

Содержание GRANDE 37

Страница 1: ...1 A D METALNA INDUSTRIJA VRANJE Radni ka br 1 PELLET BOILER GRANDE 37 INSTRUCTIONS FOR USE MAINTENANCE AND INSTALLATION ENG V 1 0_JUN 2018...

Страница 2: ...placed above the boiler part of the plant Fuel pellets are filled from above through the lid to be used for that purpose Make sure that the boiler is properly dimensioned with respect to the heating s...

Страница 3: ...G 9 7 2 INSPECTION AND PARTS THAT NEED TO BE MAINTAINED 10 7 3 ADDITIONAL MAINTENANCE 10 8 IMPORTANT SAFETY INFORMATION 10 9 PELLET QUALITY IS VERY IMPORTANT 10 9 1 PELLET STORAGE 11 10 BOILER CONTROL...

Страница 4: ...tandards or notes contained in this User Guide accidents and or damage that occurred due to improper or incorrect use by the user accidents and or damage due to modification or maintenance without aut...

Страница 5: ...the existing devices If the existence of the above indicated is established the installation can begin Follow with due attention the manufacturer s instructions the current safety norms and standards...

Страница 6: ...riers for the regulation of the flow of flue gases The connector of the 80 mm flue pipe from the pellet boiler to the chimney should have the following characteristics total length of up to 5 m in the...

Страница 7: ...oregoing requirements Section 3 1 Figure 3 An uptake should be grounded in accordance with the applicable regulations Grounding is legally defined and regulated Grounding should be independent of the...

Страница 8: ...ed led back to flue gas pipes or should enter the chimney of a greater diameter 110 120 mm Care should be taken not to use bends of a sharp angle of 90 They must be of a certain radius or made in segm...

Страница 9: ...an electrical cable for medium temperature If the power cord is damaged it must be replaced so contact our authorized service Before starting work on the electrical connection care should be taken abo...

Страница 10: ...boiler are 1 Non return valves should also be 1 or larger If the non return valve is not installed the guarantee will not apply Diagram for installation of non return valve 1 Boiler Grande 2 Circular...

Страница 11: ...boiler is a combustion device During operation some parts may heat up to very high temperatures The pellet boiler is a class C1 designed to burn wood pellets pellets with a 6 mm diameter maximum 30 m...

Страница 12: ...or a cleaning procedure follow the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the boiler is cold before beginning any procedure on the boiler Vacu...

Страница 13: ...procedure professionally you should contact the chimney sweep ADDITIONAL MAINTENANCE Your pellet boiler is a source of heat in which only pellet may be used Annual maintenance of the boiler can only b...

Страница 14: ...on of the boiler due to the use of low quality pellets Pellets should be in accordance with the DIN Standard 51731 DIN plus Norm 7135 or other comparable European standards PELLETS SHOULD NOT BE KEPT...

Страница 15: ...n Block Mode press and hold the key for 3 s and longer after the acoustic sound P4 P6 Change values Change values and settings in menus and submenus Browse menus and sub menus Browse menus and submenu...

Страница 16: ...over Ignition Block Off Errors Alarms If error alarm occurs system switches to Block Mode Error Code Alarm Code Error Alarm Description Er01 Safety Thermostat Activated Er02 Safety Manometer Activated...

Страница 17: ...s if the system is in Standby Mode due to pressed P5 key Visualizations By pressing keys P4 and P6 you enter the Visualization Menu In this menu some values of system parameters can be seen L3 On P1 P...

Страница 18: ...ters Chrono The menu for the Chrono program modalities and ignition extinguishing times Manual Load The menu for the manual auger loading Possible only if the system is in OFF state Time and Date The...

Страница 19: ...step the value is increased or decreased by 5 Example Calibration value 3 3 5 15 This means that the calibration value of the auger speed will be decreased by 15 in relation to default value Default...

Страница 20: ...ty By opening the Chrono Menu two sub menus are visible Modality and Programming By pressing P4 and P6 keys choose one of sub menus and open it by pressing P3 key The Modality Menu contains the follow...

Страница 21: ...for each day Weekly Program programming system start up shut down time for the whole week There are three time intervals available Week End Program select between two periods Monday Friday and Saturda...

Страница 22: ...to start up the boiler Following ignition phases are Check Up Phase During Check Up Phase initial test of correctness on boiler input signal probes and manometers is performed During this phase flue...

Страница 23: ...ditions is achieved 1 When the boiler reaches the set water temperature it switches to modulation and continues to increase temperature of water by inertia to the value of 4 C higher than the set wate...

Страница 24: ...longer than 3 seconds Insufficient heat transfer Contact service Obstruction of flue gas pipes Check soiling of flue gas pipes and chimney Faulty flue gas probe Er07 Encoder error Encoder signal missi...

Страница 25: ...ey longer than 3 seconds Check and clean primary air inflow pipes Check soiling and draft of flue gas pipes and chimney Obstruction of flue gas pipes Inadequately closed door during the ignition phase...

Страница 26: ...power consumption during operation of the boiler W 53 Minimum power consumption during operation of the boiler W 37 Largest electricity consumption when starting the boiler W 310 Electrical consumpti...

Страница 27: ...24 13 DIMENSIONS OF BOILER GRANDE 37 Figure 15...

Страница 28: ...RKS 1 Pellet boiler Grande 37 2 Automatic air vent 3 Safety valve 4 Hydraulic separator 5 Circulator pump 6 Expansion vessel 7 Circulator pump 8 Non return valve 9 Three way valve with pipe thermostat...

Отзывы: