During this phase the initial pellet dosing starts and the auger supplies the required amount of pellet for ignition. 
During this phase the igniter, auger and flue gases motor are active. 
  Ignition – Fixed Phase 
This phase lasts a fixed time period of 180 seconds. In case the ignition was successful before this phase ended 
it will continue until the time frame expires and the stove switches to stabilization phase. During this phase the 
igniter, auger and flue gases motor are active. 
  Ignition – Variable Phase 
This phase follows a fixed phase. The duration of this phase varies. It starts with fulfillment of the conditions for 
ignition until the temperature of flue gases is 45°C. In case the ignition of the boiler is achieved before the phase 
time expires the phase is interrupted and Stabilization Phase starts. During this phase the igniter, auger and flue 
gases motor are active. 
  Stabilization Phase 
Stabilization Phase is a transitional state between Ignition Phase and Run Mode Phase. This phase starts with 
fulfillment of the conditions for ignition or when flue gases reach the temperature of 45°C. It lasts three minutes 
and during that time the igniter, auger and flue gases motor are active. 
  Run Mode Phase 
Run Mode Phase starts after Stabilization Phase. There are five levels of power which can be set during this phase 
(see 10.3.1.1). During this phase the igniter is inactive while the auger, flue gases motor and pump are active and 
operate  at  different  intensity  depending  on  the  power  level  set.  The  boiler  is  operating  at  the  set  power  until 
modulation conditions are achieved. 
  Modulation Phase 
The boiler switches to Modulation Phase when one of two conditions is achieved: 
1.

 

When boiler achieves set water temperature 

2.

 

If flue gases temperature reaches the temperature higher than 200°C 

During Modulation Phase the boiler is operating with minimum power – power 1 until the temperature decreases 
below the set value. 
  Standby Mode 
The boiler switches to Standby Mode when one of two conditions is achieved: 
1.

 

When the boiler reaches the set water temperature it switches to modulation and continues to increase 

temperature of water by inertia to the value of 4°C higher than the set water temperature in the boiler.  
2.

 

When exterior (room) thermostat reacts 

During Standby Mode pellet dosing stops and the boiler is switching off. The boiler switches on again when the 
water temperature is 4°C lower than the set value or when the room thermostat deactivates. 
    Safety Mode 
Safety Mode occurs when the flue gases temperature  exceeds 230°C or when water temperature in the boiler 
reaches 85°C. During this phase pellet dosing stops until the flue gases temperature is beneath 230°C or the water 
temperature in the boiler is beneath 85°C. If there is no temperature reduction in the next 60 seconds the boiler 
switches to Alarm Mode and displays a message Er04 or Er05. 

   Extinguishing Phase 
The boiler is switched off by holding P2 key for 3 s and longer. The Extinguishing Phase starts during which pellet 
dosing stops while the flue gases motor and pump operate at maximum capacity to cool down the boiler as soon 
as possible. The minimum duration of the Extinguishing Phase is 300 seconds and the condition for complete 
shutdown of the stove is that the flue gases temperature is below 70°C. 
   OFF 
The boiler is switched off in this mode (the flue gases motor, the pump, the igniter and the auger are not active). 

   Block Mode 
The Block Mode occurs in case of error or alarm. During Block Mode the flue gases fan, auger and igniter are 
switched off. To exit press and hold P2 key for 3 seconds: If the blockade is overcome and nothing causes the 
alarm, the system will shut down. 
   Recover Ignition 
The boiler switches to this phase in two cases:  
1.

 

If a power failure occurs in the operation mode and the flue gases temperature is higher than 45°C. 

2.

 

Pressing the main power switch while stove is in Extinguishing Phase.   

 

10.5.

 

Possible problems and solutions  

Display 

message 

Description 

Possible causes 

Resetting errors 

Possible alarm 

solutions 

 
 
 
Er01 

 
 
Safety thermostat activation 

 
High water 
temperature in the 
boiler 

 
Wait until the 
boiler is 
completely cool 

Check the validity 
and functionality 
of the pump  

Содержание GRANDE 37

Страница 1: ...1 A D METALNA INDUSTRIJA VRANJE Radni ka br 1 PELLET BOILER GRANDE 37 INSTRUCTIONS FOR USE MAINTENANCE AND INSTALLATION ENG V 1 0_JUN 2018...

Страница 2: ...placed above the boiler part of the plant Fuel pellets are filled from above through the lid to be used for that purpose Make sure that the boiler is properly dimensioned with respect to the heating s...

Страница 3: ...G 9 7 2 INSPECTION AND PARTS THAT NEED TO BE MAINTAINED 10 7 3 ADDITIONAL MAINTENANCE 10 8 IMPORTANT SAFETY INFORMATION 10 9 PELLET QUALITY IS VERY IMPORTANT 10 9 1 PELLET STORAGE 11 10 BOILER CONTROL...

Страница 4: ...tandards or notes contained in this User Guide accidents and or damage that occurred due to improper or incorrect use by the user accidents and or damage due to modification or maintenance without aut...

Страница 5: ...the existing devices If the existence of the above indicated is established the installation can begin Follow with due attention the manufacturer s instructions the current safety norms and standards...

Страница 6: ...riers for the regulation of the flow of flue gases The connector of the 80 mm flue pipe from the pellet boiler to the chimney should have the following characteristics total length of up to 5 m in the...

Страница 7: ...oregoing requirements Section 3 1 Figure 3 An uptake should be grounded in accordance with the applicable regulations Grounding is legally defined and regulated Grounding should be independent of the...

Страница 8: ...ed led back to flue gas pipes or should enter the chimney of a greater diameter 110 120 mm Care should be taken not to use bends of a sharp angle of 90 They must be of a certain radius or made in segm...

Страница 9: ...an electrical cable for medium temperature If the power cord is damaged it must be replaced so contact our authorized service Before starting work on the electrical connection care should be taken abo...

Страница 10: ...boiler are 1 Non return valves should also be 1 or larger If the non return valve is not installed the guarantee will not apply Diagram for installation of non return valve 1 Boiler Grande 2 Circular...

Страница 11: ...boiler is a combustion device During operation some parts may heat up to very high temperatures The pellet boiler is a class C1 designed to burn wood pellets pellets with a 6 mm diameter maximum 30 m...

Страница 12: ...or a cleaning procedure follow the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the boiler is cold before beginning any procedure on the boiler Vacu...

Страница 13: ...procedure professionally you should contact the chimney sweep ADDITIONAL MAINTENANCE Your pellet boiler is a source of heat in which only pellet may be used Annual maintenance of the boiler can only b...

Страница 14: ...on of the boiler due to the use of low quality pellets Pellets should be in accordance with the DIN Standard 51731 DIN plus Norm 7135 or other comparable European standards PELLETS SHOULD NOT BE KEPT...

Страница 15: ...n Block Mode press and hold the key for 3 s and longer after the acoustic sound P4 P6 Change values Change values and settings in menus and submenus Browse menus and sub menus Browse menus and submenu...

Страница 16: ...over Ignition Block Off Errors Alarms If error alarm occurs system switches to Block Mode Error Code Alarm Code Error Alarm Description Er01 Safety Thermostat Activated Er02 Safety Manometer Activated...

Страница 17: ...s if the system is in Standby Mode due to pressed P5 key Visualizations By pressing keys P4 and P6 you enter the Visualization Menu In this menu some values of system parameters can be seen L3 On P1 P...

Страница 18: ...ters Chrono The menu for the Chrono program modalities and ignition extinguishing times Manual Load The menu for the manual auger loading Possible only if the system is in OFF state Time and Date The...

Страница 19: ...step the value is increased or decreased by 5 Example Calibration value 3 3 5 15 This means that the calibration value of the auger speed will be decreased by 15 in relation to default value Default...

Страница 20: ...ty By opening the Chrono Menu two sub menus are visible Modality and Programming By pressing P4 and P6 keys choose one of sub menus and open it by pressing P3 key The Modality Menu contains the follow...

Страница 21: ...for each day Weekly Program programming system start up shut down time for the whole week There are three time intervals available Week End Program select between two periods Monday Friday and Saturda...

Страница 22: ...to start up the boiler Following ignition phases are Check Up Phase During Check Up Phase initial test of correctness on boiler input signal probes and manometers is performed During this phase flue...

Страница 23: ...ditions is achieved 1 When the boiler reaches the set water temperature it switches to modulation and continues to increase temperature of water by inertia to the value of 4 C higher than the set wate...

Страница 24: ...longer than 3 seconds Insufficient heat transfer Contact service Obstruction of flue gas pipes Check soiling of flue gas pipes and chimney Faulty flue gas probe Er07 Encoder error Encoder signal missi...

Страница 25: ...ey longer than 3 seconds Check and clean primary air inflow pipes Check soiling and draft of flue gas pipes and chimney Obstruction of flue gas pipes Inadequately closed door during the ignition phase...

Страница 26: ...power consumption during operation of the boiler W 53 Minimum power consumption during operation of the boiler W 37 Largest electricity consumption when starting the boiler W 310 Electrical consumpti...

Страница 27: ...24 13 DIMENSIONS OF BOILER GRANDE 37 Figure 15...

Страница 28: ...RKS 1 Pellet boiler Grande 37 2 Automatic air vent 3 Safety valve 4 Hydraulic separator 5 Circulator pump 6 Expansion vessel 7 Circulator pump 8 Non return valve 9 Three way valve with pipe thermostat...

Отзывы: