background image

 

11 

 

Consult the supplier on the type of pellet, which needs to be 30 mm in size and have a 6 mm cross-section. Proper 
operation of the boiler depends on the type and quality of the pellets
. The manufacturer is not in any way responsible for 
poor performance of the boiler due to the use of poor quality pellets

 
 

 

PELLET STORAGE  

Pellets should be stored in a dry room that is not too cold. Cold and wet pellet (temperature about 5˚C) reduces the 
thermal power and demands increased boiler cleaning.  

 

People with an impaired spine and pregnant women should avoid lifting a bag of pellets.  
The manufacturer waives all responsibility for any damage or improper operation of the boiler due to the use of low 
quality pellets.  

 

Pellets should be in accordance with the DIN Standard 51731, DIN plus, Ӧ-Norm -7135 or other comparable European 
standards. 

 

PELLETS SHOULD NOT BE KEPT NEAR THE BOILER. Leave a distance of at least half a meter. 
When handling pellets, make sure that they are not wasted. 
If you add sawdust in the pellet tank, it may block the system for dosing pellets.  
 
 

10.

 

BOILER CONTROL SYSTEM 

 
The boiler is equipped
 with advanced control system which provides a safe, efficient and reliable management of the 
operation and maximum functional efficiency of the boiler.  
Characteristics: 

 

easy to install and use, 

 

easy and direct user functions,  

 

reliable and flexible functional software specifically developed for pellet boilers, 

 

advanced features available to installers in order to adapt different configurations and installations. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание GRANDE 37

Страница 1: ...1 A D METALNA INDUSTRIJA VRANJE Radni ka br 1 PELLET BOILER GRANDE 37 INSTRUCTIONS FOR USE MAINTENANCE AND INSTALLATION ENG V 1 0_JUN 2018...

Страница 2: ...placed above the boiler part of the plant Fuel pellets are filled from above through the lid to be used for that purpose Make sure that the boiler is properly dimensioned with respect to the heating s...

Страница 3: ...G 9 7 2 INSPECTION AND PARTS THAT NEED TO BE MAINTAINED 10 7 3 ADDITIONAL MAINTENANCE 10 8 IMPORTANT SAFETY INFORMATION 10 9 PELLET QUALITY IS VERY IMPORTANT 10 9 1 PELLET STORAGE 11 10 BOILER CONTROL...

Страница 4: ...tandards or notes contained in this User Guide accidents and or damage that occurred due to improper or incorrect use by the user accidents and or damage due to modification or maintenance without aut...

Страница 5: ...the existing devices If the existence of the above indicated is established the installation can begin Follow with due attention the manufacturer s instructions the current safety norms and standards...

Страница 6: ...riers for the regulation of the flow of flue gases The connector of the 80 mm flue pipe from the pellet boiler to the chimney should have the following characteristics total length of up to 5 m in the...

Страница 7: ...oregoing requirements Section 3 1 Figure 3 An uptake should be grounded in accordance with the applicable regulations Grounding is legally defined and regulated Grounding should be independent of the...

Страница 8: ...ed led back to flue gas pipes or should enter the chimney of a greater diameter 110 120 mm Care should be taken not to use bends of a sharp angle of 90 They must be of a certain radius or made in segm...

Страница 9: ...an electrical cable for medium temperature If the power cord is damaged it must be replaced so contact our authorized service Before starting work on the electrical connection care should be taken abo...

Страница 10: ...boiler are 1 Non return valves should also be 1 or larger If the non return valve is not installed the guarantee will not apply Diagram for installation of non return valve 1 Boiler Grande 2 Circular...

Страница 11: ...boiler is a combustion device During operation some parts may heat up to very high temperatures The pellet boiler is a class C1 designed to burn wood pellets pellets with a 6 mm diameter maximum 30 m...

Страница 12: ...or a cleaning procedure follow the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the boiler is cold before beginning any procedure on the boiler Vacu...

Страница 13: ...procedure professionally you should contact the chimney sweep ADDITIONAL MAINTENANCE Your pellet boiler is a source of heat in which only pellet may be used Annual maintenance of the boiler can only b...

Страница 14: ...on of the boiler due to the use of low quality pellets Pellets should be in accordance with the DIN Standard 51731 DIN plus Norm 7135 or other comparable European standards PELLETS SHOULD NOT BE KEPT...

Страница 15: ...n Block Mode press and hold the key for 3 s and longer after the acoustic sound P4 P6 Change values Change values and settings in menus and submenus Browse menus and sub menus Browse menus and submenu...

Страница 16: ...over Ignition Block Off Errors Alarms If error alarm occurs system switches to Block Mode Error Code Alarm Code Error Alarm Description Er01 Safety Thermostat Activated Er02 Safety Manometer Activated...

Страница 17: ...s if the system is in Standby Mode due to pressed P5 key Visualizations By pressing keys P4 and P6 you enter the Visualization Menu In this menu some values of system parameters can be seen L3 On P1 P...

Страница 18: ...ters Chrono The menu for the Chrono program modalities and ignition extinguishing times Manual Load The menu for the manual auger loading Possible only if the system is in OFF state Time and Date The...

Страница 19: ...step the value is increased or decreased by 5 Example Calibration value 3 3 5 15 This means that the calibration value of the auger speed will be decreased by 15 in relation to default value Default...

Страница 20: ...ty By opening the Chrono Menu two sub menus are visible Modality and Programming By pressing P4 and P6 keys choose one of sub menus and open it by pressing P3 key The Modality Menu contains the follow...

Страница 21: ...for each day Weekly Program programming system start up shut down time for the whole week There are three time intervals available Week End Program select between two periods Monday Friday and Saturda...

Страница 22: ...to start up the boiler Following ignition phases are Check Up Phase During Check Up Phase initial test of correctness on boiler input signal probes and manometers is performed During this phase flue...

Страница 23: ...ditions is achieved 1 When the boiler reaches the set water temperature it switches to modulation and continues to increase temperature of water by inertia to the value of 4 C higher than the set wate...

Страница 24: ...longer than 3 seconds Insufficient heat transfer Contact service Obstruction of flue gas pipes Check soiling of flue gas pipes and chimney Faulty flue gas probe Er07 Encoder error Encoder signal missi...

Страница 25: ...ey longer than 3 seconds Check and clean primary air inflow pipes Check soiling and draft of flue gas pipes and chimney Obstruction of flue gas pipes Inadequately closed door during the ignition phase...

Страница 26: ...power consumption during operation of the boiler W 53 Minimum power consumption during operation of the boiler W 37 Largest electricity consumption when starting the boiler W 310 Electrical consumpti...

Страница 27: ...24 13 DIMENSIONS OF BOILER GRANDE 37 Figure 15...

Страница 28: ...RKS 1 Pellet boiler Grande 37 2 Automatic air vent 3 Safety valve 4 Hydraulic separator 5 Circulator pump 6 Expansion vessel 7 Circulator pump 8 Non return valve 9 Three way valve with pipe thermostat...

Отзывы: