background image

 

13 

 

P5 

 

Manual Standby 

Press and hold key for 3s to activate Standby mode 

 

 

LED symbols: 

 

Igniter 

Led ON: Igniter is active 

 

Auger 

Led ON: Auger is active 

 

Pump 

Led ON: Pump is active 

L3 

Aux 1 

Led ON: Aux 1 is active 

L4 

Additional motor 

Led ON: Additional motor is active 

L5 

Aux 2 

Led ON: Aux 2 is active 

L6 

Aux 3 

Led ON: Aux 3 is active 

L7 

Not active 

 

L8 

Not active 

 

L9 

Pellet level sensor 

Led ON: Out of pellet 

 

Exterior thermostat 

Led ON: Contact is open 

 

Sanitary water switch 

Led ON: Sanitary water required 

   

 
 

 

Display: 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Display: 

o

 

Date and Time  

o

 

Chrono Modality (D-Daily, W-Weekly, We-Week-End) 

o

 

System Power (P1, P2, P3, P4 and P5) 

o

 

Recipe (Pellet 1) 

o

 

System Mode (Check Up, Ignition, Stabilization, Run Mode, Modulation, Standby, Safety, Extinguishing, Recover 

Ignition, Block, Off) 

Errors (Alarms): 

If error (alarm) occurs, system switches to Block Mode. 

Error Code 

(Alarm Code) 

Error (Alarm) Description 

Er01 

Safety Thermostat Activated 

Er02 

Safety Manometer Activated 

Er03 

Extinguishing due to low temperature of flue gases 

Er04 

Extinguishing due to high water temperature in the boiler 

Er05 

Extinguishing due to high temperature of flue gases 

Er06 

Safety thermostat on auger housing is activated 

Er07 

Encoder error. No signal 

Er08 

Encoder error. Unable to adjust number of revolutions 

Er09 

Low water pressure 

Er10 

High water pressure 

Er11 

Error due to problems with the internal clock 

Er12 

Extinguishing due to ignition failure 

Er15 

Power outage longer than 50 minutes 

Chrono Enable 

Summer-Winter 

 

 

 

 

Set System Power 

Recipe 

Leds 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Current water 

temperature in the boiler 

 

Set water temperature in 

the boiler 

  

Error Code (Alarm) 

Maximum number of 

operating hours achieved  

Date and Time 

System Mode 

Содержание GRANDE 37

Страница 1: ...1 A D METALNA INDUSTRIJA VRANJE Radni ka br 1 PELLET BOILER GRANDE 37 INSTRUCTIONS FOR USE MAINTENANCE AND INSTALLATION ENG V 1 0_JUN 2018...

Страница 2: ...placed above the boiler part of the plant Fuel pellets are filled from above through the lid to be used for that purpose Make sure that the boiler is properly dimensioned with respect to the heating s...

Страница 3: ...G 9 7 2 INSPECTION AND PARTS THAT NEED TO BE MAINTAINED 10 7 3 ADDITIONAL MAINTENANCE 10 8 IMPORTANT SAFETY INFORMATION 10 9 PELLET QUALITY IS VERY IMPORTANT 10 9 1 PELLET STORAGE 11 10 BOILER CONTROL...

Страница 4: ...tandards or notes contained in this User Guide accidents and or damage that occurred due to improper or incorrect use by the user accidents and or damage due to modification or maintenance without aut...

Страница 5: ...the existing devices If the existence of the above indicated is established the installation can begin Follow with due attention the manufacturer s instructions the current safety norms and standards...

Страница 6: ...riers for the regulation of the flow of flue gases The connector of the 80 mm flue pipe from the pellet boiler to the chimney should have the following characteristics total length of up to 5 m in the...

Страница 7: ...oregoing requirements Section 3 1 Figure 3 An uptake should be grounded in accordance with the applicable regulations Grounding is legally defined and regulated Grounding should be independent of the...

Страница 8: ...ed led back to flue gas pipes or should enter the chimney of a greater diameter 110 120 mm Care should be taken not to use bends of a sharp angle of 90 They must be of a certain radius or made in segm...

Страница 9: ...an electrical cable for medium temperature If the power cord is damaged it must be replaced so contact our authorized service Before starting work on the electrical connection care should be taken abo...

Страница 10: ...boiler are 1 Non return valves should also be 1 or larger If the non return valve is not installed the guarantee will not apply Diagram for installation of non return valve 1 Boiler Grande 2 Circular...

Страница 11: ...boiler is a combustion device During operation some parts may heat up to very high temperatures The pellet boiler is a class C1 designed to burn wood pellets pellets with a 6 mm diameter maximum 30 m...

Страница 12: ...or a cleaning procedure follow the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the boiler is cold before beginning any procedure on the boiler Vacu...

Страница 13: ...procedure professionally you should contact the chimney sweep ADDITIONAL MAINTENANCE Your pellet boiler is a source of heat in which only pellet may be used Annual maintenance of the boiler can only b...

Страница 14: ...on of the boiler due to the use of low quality pellets Pellets should be in accordance with the DIN Standard 51731 DIN plus Norm 7135 or other comparable European standards PELLETS SHOULD NOT BE KEPT...

Страница 15: ...n Block Mode press and hold the key for 3 s and longer after the acoustic sound P4 P6 Change values Change values and settings in menus and submenus Browse menus and sub menus Browse menus and submenu...

Страница 16: ...over Ignition Block Off Errors Alarms If error alarm occurs system switches to Block Mode Error Code Alarm Code Error Alarm Description Er01 Safety Thermostat Activated Er02 Safety Manometer Activated...

Страница 17: ...s if the system is in Standby Mode due to pressed P5 key Visualizations By pressing keys P4 and P6 you enter the Visualization Menu In this menu some values of system parameters can be seen L3 On P1 P...

Страница 18: ...ters Chrono The menu for the Chrono program modalities and ignition extinguishing times Manual Load The menu for the manual auger loading Possible only if the system is in OFF state Time and Date The...

Страница 19: ...step the value is increased or decreased by 5 Example Calibration value 3 3 5 15 This means that the calibration value of the auger speed will be decreased by 15 in relation to default value Default...

Страница 20: ...ty By opening the Chrono Menu two sub menus are visible Modality and Programming By pressing P4 and P6 keys choose one of sub menus and open it by pressing P3 key The Modality Menu contains the follow...

Страница 21: ...for each day Weekly Program programming system start up shut down time for the whole week There are three time intervals available Week End Program select between two periods Monday Friday and Saturda...

Страница 22: ...to start up the boiler Following ignition phases are Check Up Phase During Check Up Phase initial test of correctness on boiler input signal probes and manometers is performed During this phase flue...

Страница 23: ...ditions is achieved 1 When the boiler reaches the set water temperature it switches to modulation and continues to increase temperature of water by inertia to the value of 4 C higher than the set wate...

Страница 24: ...longer than 3 seconds Insufficient heat transfer Contact service Obstruction of flue gas pipes Check soiling of flue gas pipes and chimney Faulty flue gas probe Er07 Encoder error Encoder signal missi...

Страница 25: ...ey longer than 3 seconds Check and clean primary air inflow pipes Check soiling and draft of flue gas pipes and chimney Obstruction of flue gas pipes Inadequately closed door during the ignition phase...

Страница 26: ...power consumption during operation of the boiler W 53 Minimum power consumption during operation of the boiler W 37 Largest electricity consumption when starting the boiler W 310 Electrical consumpti...

Страница 27: ...24 13 DIMENSIONS OF BOILER GRANDE 37 Figure 15...

Страница 28: ...RKS 1 Pellet boiler Grande 37 2 Automatic air vent 3 Safety valve 4 Hydraulic separator 5 Circulator pump 6 Expansion vessel 7 Circulator pump 8 Non return valve 9 Three way valve with pipe thermostat...

Отзывы: