TB
TB
TB
TB
LB
LB
LB
LB
LB
LB
6.2.2 Opening procedure
1
Shut down the heat exchanger.
2
Close the valves and isolate the heat
exchanger from the rest of the system.
3
Drain the heat exchanger.
NOTE
Avoid vacuum in the heat exchanger by
opening vent valves.
4
Remove the protection sheets, if any.
5
Dismantle pipes from the pressure plate so
that the pressure plate are free to move along
the carrying bar.
6
Inspect the sliding surfaces of the carrying
bar and wipe clean and grease.
200000418-2-EN-GB
34
6 Maintenance
EN
Содержание Industrial Series
Страница 10: ...200000418 2 EN GB 10 2 Safety EN Safety ...
Страница 18: ...200000418 2 EN GB 18 3 Description EN ...
Страница 23: ...Figure 5 Lifting device for T25 MX25 and MA30 S 200000418 2 EN GB 23 Installation 4 EN ...
Страница 26: ...200000418 2 EN GB 26 4 Installation EN ...
Страница 30: ...200000418 2 EN GB 30 5 Operation EN ...