
6
5.2
OPERATING
ERRORS 57
5.2.1
Some
Typical
Problems
58
5.3
PERIODIC
MAINTENANCE 59
Automatic
Control
Devices
60
6.
Use
with
LPG
61
7. COMMISSIONING
61
7.1
Pre
Checks
61
7.2
Start
up
62
7.3
Setting
The
Heat
Input
63
7.4 Maximum and Minimum DHW/CH Input Adjustments
(mechanical maximum and minimum)
64
7.5 Final Operational Checks
65
7.6 Commissioning – Heating System
65
7.7 INSTRUCTIONS TO THE USER
66
8. SERVICING
66
Appendix
A
70
FAULT
FINDING
70
TABLES
Table
1
Technical
Data
15
Table 2 Clearances for boiler installation
26
Table 3 Minimum clearances for cupboard installation.
27
Table 4 Minimum ventilation areas for cupboards
28
without
sufficient
clearance.
Table 5 Setting the Parameters
53
Table
6
Parameter
Adjustment
55
Table
7
Fault
Display
57
Содержание HARMONY - D
Страница 1: ...1 USERS INSTALLATION AND SERVICING INSTRUCTIONS HARMONY D ...
Страница 2: ...2 Code No A 1 2 8i Publishing Date 200114 Revision Date 200114 ...
Страница 36: ...36 HARMONY_D USERS INSTALLATION AND SERVICE MANUAL 27 Figure 15 Wall Connections Figure 16 Extensions Elbow ...
Страница 70: ...70 HARMONY_D USERS INSTALLATION AND SERVICE MANUAL 55 Appendix A FAULT DETERMINATION ...
Страница 71: ...71 ...