16
1
2
3
4
5
x
After the installation of the boiler
all
the water and fuel
connections and
valves
must
be
controlled for leakage.
x
For ACK2 and ACK3 type
boilers, it is advisable
to have a
three-way valve
between flow and return line in order to keep the water return line over
55 °C in order to overcome condensation problem.
x
ACK2
and ACK3
boilers have condensation outlet which is on the boiler
flue gas side, this outlet shall be drained with a siphon in order to
prevent flue gas leakage from boiler. Condensation drain shall be
according to local codes.
x
ACK2 and ACK3
boilers, it is advisable
to have the circulation pump on the
flow direction at closed expansion systems and on the return line on open
vented expansion systems.
x
For ACK2 and ACK3
boilers, it is advisable
to have the safety valve on flow
line to the connection present on the boiler outlet pipe without any valve.
x
For connection of the closed expansion tank it is advice to have on return
line and a lockable valve + drain valve is advised only for servicing.
x
If necessary, national regulations regarding the condensate waste disposal
rules shall be applied.
Содержание ACK2
Страница 1: ...Operation Manual ACK2 ACK3 HEATING SYSTEM BOILERS WITH LIQUID GAS FUEL...
Страница 2: ...Code No A 4 1 3 i Published on 210910 Revision No 210910...
Страница 4: ......
Страница 33: ...BOILER CONTROL PANEL WIRING DIAGRAMS 33...
Страница 36: ...ANNEXES 36...
Страница 37: ...37...
Страница 38: ...38...
Страница 39: ...39...
Страница 40: ...40...
Страница 41: ...41...