12-7
CONTROL SYSTEM
SM DLSDCI 3-A.1 GB
12.3
General Operating Rules
12.3.1
Power up Sequence
After Power up A/C must perform some initialization procedures.
•
Thermistors short/disconnect.
•
Compressor Driver communication connected and error codes if any.
•
Fans connected – check feedback.
•
EEPROM power up parameters uploads.
•
EEV initialization – zero process.
•
ODU-IDU-DMSMP communication check.