HORIZONTAL INSTALLATION

FIRE, EXPLOSION, AND CARBON MONOXIDE

POISONING HAZARD

Failure to follow this warning could result in personal

injury, death, and/or property damage.
Do not install the furnace on its back or hang furnace with

control compartment facing downward.

Safety control

operation will be adversely affected.

Never connect

return--air ducts to the back of the furnace.

!

WARNING

The furnace can be installed horizontally in an attic or crawl space
on either the left--hand (LH) or right--hand (RH) side. The furnace

can be hung from floor joists, rafters or trusses or installed on a

non--combustible platform, blocks, bricks or pad.

Suspended Furnace Support

The furnace may be supported under each end with threaded rod,

angle iron or metal plumber’s strap as shown. (See Fig. 15 and

16.) Secure angle iron to bottom of furnace as shown.
Heavy--gauge sheet metal straps (plumber’s straps) may be used

to suspend the furnace from each bottom corner. To prevent
screws from pulling out, use 2 #8 x 3/4--in. (19 mm) screws into

the side and 2 #8 x 3/4--in. (19 mm) screws in the bottom of the

furnace casing for each strap. (See Fig. 15 and 16.) If the screws
are attached to ONLY the furnace sides and not the bottom, the

straps must be vertical against the furnace sides and not pull away
from the furnace sides, so that the strap attachment screws are not

in tension (are loaded in shear) for reliable support.

Platform Furnace Support

Construct working platform at location where all required furnace
clearances are met. (See Fig. 2 and 17.) For furnaces with 1--in.

(25 mm) clearance requirement on side, set furnace on

noncombustible blocks, bricks or angle iron. For crawl space
installations, if the furnace is not suspended from the floor joists,

the ground underneath furnace must be level and the furnace set
on blocks or bricks.

Roll--Out Protection

Provide a minimum 17--3/4 in. x 22 in. (451 mm x 559 mm)

piece of sheet metal for flame roll--out protection in front of
burner area for furnaces closer than 12 inches (305 mm) above

the combustible deck or suspended furnaces closer than 12 inches

(305 mm) to joists. The sheet metal MUST extend underneath the
furnace casing by 1 in. (25 mm) with the door removed.

The bottom closure panel on furnaces of widths 17--1/2 in. (445
mm) and larger may be used for flame roll--out protection when

bottom of furnace is used for return air connection. See Fig. 17

for proper orientation of roll--out shield.

Bottom Return Air Inlet

These furnaces are shipped with bottom closure panel installed in
bottom return--air opening. Remove and discard this panel when

bottom return air is used. To remove bottom closure panel,
perform the following:

1. Tilt or raise furnace and remove two screws holding bot-

tom filler panel. (See Fig. 9.)

2. Rotate bottom filler panel downward to release holding

tabs.

3. Remove bottom closure panel.
4. Reinstall bottom filler panel and screws. Side Return Air

Inlet

Side Return Air Inlet

These furnaces are shipped with bottom closure panel installed in

bottom return--air opening. This panel MUST be in place when
side return air inlet(s) is used without a bottom return air inlet.

Not all horizontal furnaces are approved for side return air
connections. (See Fig. 20).

FILTER ARRANGEMENT

CARBON MONOXIDE AND POISONING

HAZARD

Failure to follow this warning could result in personal

injury, or death.
Never operate a furnace without a filter or with filter access

door removed.

!

WARNING

There are no provisions for an internal filter rack in these

furnaces.
A field--supplied accessory external filter is required.
Refer to the instructions supplied with the external filter rack for
assembly and installation options.

AIR DUCTS
General Requirements

The duct system should be designed and sized according to
accepted national standards such as those published by: Air

Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA)

or American Society of Heating, Refrigerating and Air
Conditioning Engineers (ASHRAE) or consult The Air Systems

Design Guidelines reference tables available from your local

distributor. The duct system should be sized to handle the
required system design CFM at the design external static pressure.

The furnace airflow rates are provided in Table 5 -- AIR
DELIVERY--CFM (With Filter).

When a furnace is installed so that the supply ducts carry air

circulated by the furnace to areas outside the space containing the
furnace, the return air shall also be handled by duct(s) sealed to

the furnace casing and terminating outside the space containing
the furnace.

Secure ductwork with proper fasteners for type of ductwork used.

Seal supply-- and return--duct connections to furnace with code
approved tape or duct sealer.

NOTE

: Flexible connections should be used between ductwork

and furnace to prevent transmission of vibration. Ductwork
passing through unconditioned space should be insulated and
sealed to enhance system performance. When air conditioning is
used, a vapor barrier is recommended.
Maintain a 1--in. (25 mm) clearance from combustible materials
to supply air ductwork for a distance of 36 in. (914 mm)
horizontally from the furnace. See NFPA 90B or local code for
further requirements.

Ductwork Acoustical Treatment
NOTE

: Metal duct systems that do not have a 90 degree elbow

and 10 ft. (3 M) of main duct to the first branch take--off may
require internal acoustical lining. As an alternative, fibrous
ductwork may be used if constructed and installed in accordance
with the latest edition of SMACNA construction standard on
fibrous glass ducts. Both acoustical lining and fibrous ductwork
shall comply with NFPA 90B as tested by UL Standard 181 for
Class 1 Rigid air ducts.

Supply Air Connections

For a furnace not equipped with a cooling coil, the outlet duct

shall be provided with a removable access panel. This opening
shall be accessible when the furnace is installed and shall be of

such a size that the heat exchanger can be viewed for possible
openings using light assistance or a probe can be inserted for

sampling the airstream. The cover attachment shall prevent leaks.

PG

8M

EA

Содержание PG8JEA

Страница 1: ...36 General 36 Start up Procedures 36 Adjustments 36 Check Safety Controls 39 Checklist 40 SERVICE AND MAINTENANCE PROCEDURES 42 Introduction 42 Electrical Controls and Wiring 42 Care and Maintenance 46 Cleaning and or Replacing Filter 44 Blower Motor and Wheel 44 Cleaning Heat Exchanger 45 Sequence of Operation 46 Wiring Diagrams 48 Troubleshooting 48 Accessory List 52 REPLACEMENT INFORMATION GUID...

Страница 2: ...section of these instructions 3 Provide adequate combustion and ventilation air to the furnace space as specified in Air for Combustion and Ventilation section 4 Combustion products must be discharged outdoors Con nect this furnace to an approved vent system only as spe cified in the Venting section of these instructions 5 Never test for gas leaks with an open flame Use a com mercially available s...

Страница 3: ...219 219 5 1 2 5 1 2 140 3 140 3 8 7 16 8 7 16 213 5 213 5 FRONT OF CASING FRONT OF CASING TOP OF CASING TOP OF CASING 6 1 6 1 155 7 155 7 2 1 16 2 1 16 51 6 51 6 5 1 5 1 130 5 130 5 1 7 1 7 43 5 43 5 Ø7 8 Ø7 8 22 2 22 2 ACCESSORY 2 ACCESSORY 2 AIR FLOW AIR FLOW AIR FLOW AIR FLOW BOTTOM RETURN BOTTOM RETURN WIDTH WIDTH AIR FLOW AIR FLOW KNOCK OUTS FOR KNOCK OUTS FOR VENTING 5 VENTING 5 PLACES PLACE...

Страница 4: ...4 A10269 Fig 2 Clearances to Combustibles PG8MEA ...

Страница 5: ...roper installation or service of furnace may cause premature furnace component failure Electrostatic discharge can affect electronic components Follow the Electrostatic Discharge Precautions Procedure listed below during furnace installation and servicing to protect the furnace electronic control Precautions will prevent electrostatic discharges from personnel and hand tools which are held during ...

Страница 6: ...low this warning could result in personal injury or death and unit component damage Corrosive or contaminated air may cause failure of parts containing flue gas which could leak into the living space Air for combustion must not be contaminated by halogen compounds which include fluoride chloride bromide and iodide These elements can corrode heat exchangers and shorten furnace life Air contaminants...

Страница 7: ...all dust into combustion air which can cause fouling and plugging of furnace components The temperature of the return air to the furnace is maintained between 55_F 13_C and 80_F 27_C with no evening setback or shutdown The use of the furnace while the structure is under construction is deemed to be intermittent operation per our installation instructions The air temperature rise is within the rate...

Страница 8: ...eration of either unit unless the damper is in the full heat or full cool position AIR FOR COMBUSTION AND VENTILATION Provisions for adequate combustion ventilation and dilution air must be provided in accordance with S U S installations Section 9 3 of the NFGC NFPA54 ANSI Z223 1 2009 Air for Combustion and Ventilation and applicable provisions of the local building codes WARNING CARBON MONOXIDE P...

Страница 9: ...ollow this warning could result in death and or personal injury Many homes require air to be supplied from outdoors for furnace combustion ventilation and dilution of flue gases The furnace combustion air supply must be provided in accordance with this instruction manual WARNING CIRCULATING AIR DUCTS 6 MIN FRONT Ü CIRCULATING AIR DUCTS VENT THROUGH ROOF 1 SQ IN PER 1000 BTUH IN DOOR OR WALL 12 MAX...

Страница 10: ...n of Indoor and Outdoor Air 1 Indoor openings shall comply with the Indoor Combus tion Air Method below and 2 Outdoor openings shall be located as required in the Out door Combustion Air Method mentioned previously and 3 Outdoor openings shall be sized as follows a Calculate the Ratio of all Indoor Space volume divided by required volume for Indoor Combustion Air Meth od below b Outdoor opening si...

Страница 11: ...commended that the perforated supply air duct flanges be completely folded over or removed from furnace when installing the furnace on a factory supplied cased coil or coil box To remove the supply air duct flange use wide duct pliers or hand seamers to bend flange back and forth until it breaks off Be careful of sharp edges See Fig 14 Bottom Return Air Inlet These furnaces are shipped with bottom...

Страница 12: ...ons on combustible flooring KGASB sub base required 15 1 8 384 19 483 16 3 4 425 20 5 8 600 Downflow Applications on Combustible Flooring with CNPV CNRV CAR or CAP Coil Assembly or KCAKC coil box KGASB subbase not required 15 1 2 394 19 483 16 1 2 419 20 508 21 533 Upflow Applications on Combustible or Noncombustible Floor ing KGASB subbase not required 19 1 2 495 21 5 8 549 20 1 8 511 22 1 4 565 ...

Страница 13: ...ith bottom closure panel installed in bottom return air opening This panel MUST be in place when side return air inlet s is used without a bottom return air inlet Not all horizontal furnaces are approved for side return air connections See Fig 20 FILTER ARRANGEMENT CARBON MONOXIDE AND POISONING HAZARD Failure to follow this warning could result in personal injury or death Never operate a furnace w...

Страница 14: ...ge inward past 90_ with wide duct pliers See Fig 14 The supply air duct must be connected to ONLY the furnace supply outlet or air conditioning coil casing when used When installed on combustible material supply air duct must be connected to ONLY the factory approved accessory subbase or a factory approved air conditioning coil casing DO NOT cut main furnace casing to attach supply side air duct h...

Страница 15: ...Suspension with Straps 30 IN 762mm MIN WORK AREA 6 MIN TYPE B VENT 17 3 4 22 SHEET METAL SEDIMENT TRAP EQUIPMENT MANUAL SHUT OFF GAS VALVE LINE CONTACT ONLY PERMISSIBLE BETWEEN LINES FORMED BY INTERSECTIONS OF THE TOP AND TWO SIDES OF THE FURNACE JACKET AND BUILDING JOISTS STUDS OR FRAMING GAS ENTRY 17 3 4 451mm OVERALL 4 3 4 121mm UNDER DOOR 1 25mm UNDER FURNACE EXTEND OUT 12 305mm FROM FACE OF D...

Страница 16: ...s control valve and extend a minimum of 2 in 51 mm outside the furnace WARNING Gas piping must be installed in accordance with national and local codes Refer to current edition of NFGC Installations must be made in accordance with all authorities having jurisdiction If possible the gas supply line should be a separate line running directly from meter to furnace NOTE In the state of Massachusetts 1...

Страница 17: ...ormance included 3 4 in 19 mm washable filter media such as contained in factory authorized accessory filter rack To determine airflow performance without this filter assume an additional 0 1 In W C available external static pressure Indicates unstable operating conditions Table 6 Maximum Capacity of Pipe NOMINAL IRON PIPE INTERNAL DIAMETER LENGTH OF PIPE FT M SIZE IN mm In mm 10 20 30 40 50 1 2 1...

Страница 18: ...18 A02075 Fig 18 Upflow Return Air Configurations and Restrictions A02163 Fig 19 Downflow Return Air Configurations and Restrictions PG8MEA ...

Страница 19: ...19 A02162 Fig 20 Horizontal Return Air Configurations and Restrictions 2 51mm Street Elbow A08551 Fig 21 Burner and Manifold PG8MEA ...

Страница 20: ...l Gas Pipe Arrangement ELECTRICAL CONNECTIONS ELECTRICAL SHOCK HAZARD Failure to follow this warning could result in personal injury or death Blower access panel door switch opens 115 v power to control No component operation can occur Do not bypass or close switch with panel removed WARNING See Fig 25 for field wiring diagram showing typical field 115 v wiring Check all factory and field electric...

Страница 21: ...r to move the J Box Do NOT remove green ground screw inside J Box 2 Cut wire tie on loop in furnace wires attached to J box 3 Move J Box to desired location 4 Fasten J Box to casing with two screws removed in Step 1 5 Route J Box wires within furnace away from sharp edges rotating parts and hot surfaces ELECTRICAL CONNECTION TO J BOX Electrical Box on Furnace Casing Side FIRE OR ELECTRICAL SHOCK H...

Страница 22: ...r proper cooling operation Use only AWG No 18 color coded copper thermostat wire The 24 v circuit contains an automotive type 3 amp fuse located on the control Any direct shorts during installation service or maintenance could cause this fuse to blow If fuse replacement is required use ONLY a 3 amp fuse of identical size ACCESSORIES 1 Electronic Air Cleaner EAC Connect an accessory Electronic Air ...

Страница 23: ...AUXILIARY J BOX 24 V TERMINAL BLOCK THREE WIRE HEATING ONLY FIVE WIRE NOTE 1 NOTE 2 FIELD SUPPLIED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE C O N T R O L R G COM W C R G Y GND GND FIELD 24 V WIRING FIELD 115 208 230 460 V WIRING FACTORY 24 V WIRING FACTORY 115 V WIRING 208 230 OR 460 V THREE PHASE 208 230 V SINGLE PHASE BLOWER DOOR SWITCH WHT BLK WHT BLK NOTES Connect Y terminal in furnace as s...

Страница 24: ...wing these figures A04216 Fig 27 Single Stage Furnace with Two Speed Air Condi tioner See notes 1 2 4 6 7 9 10 and 12 on the page following these figures A04217 Fig 28 Single Stage Furnace with Single Speed Heat Pump Dual Fuel See notes 1 2 3 4 6 8 9 10 and 12 on the page following these figures A04218 Fig 29 Single Stage Furnace with Two Speed heat Pump Dual Fuel PG8MEA ...

Страница 25: ...default 5 Dip switch No 1 on humidity sensing thermostat should be set in ON position for heat pump installations 6 Dip switch No 2 on humidity sensing thermostat should be set in OFF position for single speed compressor operation This is factory default 7 Dip switch No 2 on humidity sensing thermostat should be set in ON position for two speed compressor operation 8 Configuration Option No 10 Dua...

Страница 26: ...nd installation requirements including local building codes the National Fuel Gas Code ANSI Z223 1 2009 NFPA 54 2009 NFGC Parts 12 and 13 the local building codes and furnace and vent manufacturers instructions These furnaces are design certified as Category I furnaces in accordance with ANSI Z21 47 2006 CSA 2 3 2006 and operate with a non positive vent static pressure to minimize the potential fo...

Страница 27: ...nry Chimney FAN NAT Installations with Type B Double Wall Vent Connectors NFPA AGA Table 8 Combined Appliance Maximum Input Rating in Thousands of BTUH per Hour VENT HEIGHT FT M INTERNAL AREA OF CHIMNEY IN2 MM2 12 7741 19 12258 28 18064 38 24516 6 1 8 74 119 178 257 8 2 4 80 130 193 279 10 3 0 84 138 207 299 15 4 5 NR 152 233 334 20 6 0 NR NR 250 368 30 9 1 NR NR NR 404 Table 9 Minimum Allowable I...

Страница 28: ...28 A10133 Fig 33 Chimney Inspection Chart PG8MEA ...

Страница 29: ... factory supplied vent elbow does NOT count as part of the number of vent connector elbows The vent connector can exit the furnace through one of 5 locations on the casing 1 Attach the single wall vent connector to the furnace vent elbow and fasten the vent connector to the vent elbow with at least two field supplied corrosion resistant sheet metal screws located 180_ apart NOTE An accessory flue ...

Страница 30: ...ig 42 132 000 5 127 7 2 NOTE All vent configurations must also meet National Fuel Gas Code venting requirements NFGC 4 in 102 mm inside casing or vent guard Including 4 in 102 mm vent section s SEE NOTES 1 2 4 7 8 9 on the page following these figures A03208 Fig 34 Upflow Application Vent Elbow Up SEE NOTES 1 2 3 4 7 8 9 on the pages following these figures A03209 Fig 35 Upflow Application Vent El...

Страница 31: ... 9 on the page following these figures A03212 Fig 39 Downflow Application Vent Elbow Up then Right SEE NOTES 1 2 4 7 8 9 on the page following these figures A03213 Fig 40 Horizontal Left Application Vent Elbow Left SEE NOTES 1 2 4 5 7 8 9 on the page following these figures A03214 Fig 41 Horizontal Left Application Vent Elbow Right then Up PG8MEA ...

Страница 32: ...nstallations must use Type B vent immediately after exiting the furnace except when factory authorized Downflow Vent Guard Kit is used in the downflow position See Table 16 for accessory listing 4 Type B vent where required refer to Note 1 above 5 Four inch single wall 26 ga min vent must be used inside furnace casing and when the Downflow Vent Guard Kit is used external to the furnace See Table 1...

Страница 33: ...LECTRICAL SHOCK HAZARD Failure to follow this warning could result in personal injury or death Blower access door switch opens 115 v power to control No component operation can occur unless switch is closed Caution must be taken when manually closing this switch for service purposes WARNING NOTE The furnace control allows all components except the gas valve to be run for short period of time This ...

Страница 34: ...and turn regulator adjusting screw counterclockwise out to decrease input rate of clockwise in to increase input rate h Install regulator seal cap i Leave manometer or similar device connected and pro ceed to Step 4 NOTE DO NOT set manifold pressure less than 3 2 In W C or more than 3 8 In W C for natural gas at sea level If manifold pressure is outside this range change main burner orifices Refer...

Страница 35: ...W The thermostat anticipator should NOT be in the circuit while measuring current 1 Remove thermostat from subbase or from wall 2 Connect an amp meter as shown in Fig 49 across the R and W subbase terminals or R and W wires at wall 3 Record amp draw across terminals when furnace is in heating and after blower starts 4 Set heat anticipator on thermostat per thermostat in structions and install on s...

Страница 36: ...eck draft safeguard switch The purpose of this control is to cause the safe shutdown of the furnace during certain blocked vent conditions R Y W G 10 TURNS THERMOSTAT SUBBASE TERMINALS WITH THERMOSTAT REMOVED ANITICIPATOR CLOCK ETC MUST BE OUT OF CIRCUIT HOOK AROUND AMMETER EXAMPLE 5 0 AMPS ON AMMETER 10 TURNS AROUND JAWS 0 5 AMPS FOR THERMOSTAT ANTICIPATOR SETTING FROM UNIT 24 V CONTROL TERMINALS...

Страница 37: ... 621 78 46 92 231 30 120 240 600 80 45 90 225 31 116 232 581 82 44 88 220 32 113 225 563 84 43 86 214 33 109 218 545 86 42 84 209 34 106 212 529 88 41 82 205 35 103 206 514 90 40 80 200 36 100 200 500 92 39 78 196 37 97 195 486 94 38 76 192 38 95 189 474 96 38 75 188 39 92 185 462 98 37 74 184 40 90 180 450 100 36 72 180 41 88 176 439 102 35 71 178 42 86 172 429 104 35 69 173 43 84 167 419 106 34 ...

Страница 38: ...38 Table 13 Orifice Size and Manifold Pressure In W C for Gas Input Rate A10180 PG8MEA ...

Страница 39: ...39 Table 13 Orifice Size and Manifold Pressure In W C for Gas Input Rate CONT A10180A PG8MEA ...

Страница 40: ...40 Table 14 Orifice Size And Manifold Pressure In W C For Gas Input Rate A10181 PG8MEA ...

Страница 41: ...41 Table 14 Orifice Size And Manifold Pressure In W C For Gas Input Rate CONT A10181A PG8MEA ...

Страница 42: ...or field wiring information and to Fig 54 for furnace wiring information NOTE If the polarity is not correct the STATUS LED on the control will flash rapidly and prevent the furnace from heating The control system also requires an earth ground for proper operation of the control and flame sensing electrode The 24 v circuit contains an automotive type 3 amp fuse located on the control See Fig 24 An...

Страница 43: ...out Switch open 34 IGNITION PROVING FAILURE Control will try three more times before lockout 14 occurs If flame signal lost during blower on delay period blower will come on for the selected blower off delay Check for Flame sensor must not be grounded Oxide buildup on flame sensor clean with fine steel wool Proper flame sense microamps 5 microamps D C min 4 0 6 0 nominal Gas valve defective or gas...

Страница 44: ...motor and wheel as follows 1 Turn off electrical supply to furnace 2 Remove outer door 3 For downflow or horizontal furnaces having vent pipes within the furnace that pass in front of the blower access door a Disconnect vent connector from furnace vent elbow b Disconnect and remove short piece of vent pipe from within furnace 4 Remove two screws from blower access door and remove blower access doo...

Страница 45: ...avy build up of soot and carbon indicates that a problem exists which needs to be corrected such as improper adjustment of manifold pressure insufficient or poor quality combustion air incorrect size or damaged manifold orifice s improper gas or a restricted heat exchanger Action must be taken to correct the problem If it becomes necessary to clean the heat exchangers because of dust or corrosion ...

Страница 46: ...and check furnace for proper operation 18 Verify blower airflow and speed changes between heating and cooling 19 Check for gas leaks 20 Replace outer access door A91252 Fig 53 Cleaning Heat Exchanger Cell FIRE OR EXPLOSION HAZARD Failure to follow this warning could result in personal injury death and or property damage Never purge a gas line into a combustion chamber Never test for gas leaks with...

Страница 47: ...ill remain energized for an additional 90 seconds Jumper Y1 to DHUM to re duce the cooling off delay to 5 seconds See Fig 24 3 Humidity Sensing Thermostat Mode See Fig 26 29 for humidity sensing thermostat connec tions The dehumidification output DHUM on the humidity sensing thermostat should be connected to the furnace control thermostat terminal DHUM When there is a dehu midify demand the DHUM i...

Страница 48: ...e same time the blower motor BLWM will remain on for the selected blower OFF delay period If the R to W and Y1 signals disappear leaving the G signal the blower motor BLWM will remain on for the selected blower OFF delay period then switch to continuous blower speed When the R to W and Y Y2 R to W and Y Y2 and G R to W and Y1 and Y Y2 or R to W and Y1 and Y Y2 and G circuits are ener gized the fur...

Страница 49: ...49 A08176 Fig 54 Wiring Diagram PG8MEA ...

Страница 50: ...t sequence The inducer will start and run for the entire component test The HSI blower motor FAN speed AMBER LED boards only HEAT speed and COOL speed will run for 10 15 seconds each Gas valve and humidifier will not be turned on Was there a previous status code other than 11 Is door switch closed Is there 115V going to switch Replace door switch Replace transformer Does the control respond to W Y...

Страница 51: ...tion air supply flame rollout switch open Restricted vent Proper vent sizing Excessive wind 34 IGNITION PROVING FAILURE If flame is not sensed during the trial for ignition period the control will repeat the ignition sequence 3 more times before lockout 14 occurs If flame signal is lost during the blower on delay period blower will come on for the selected blower off delay Check the following item...

Страница 52: ...ter Rack KGAFR0801SRE Ext Side filter rack all casings includes filter Unframed Filter 3 4 in 19 mm KGAWF1301UFR 1 unframed filter 16x25x3 4 406x635x19 mm KGAWF1401UFR 1 unframed filter 20x25x3 4 508x635x19 mm KGAWF1501UFR 1 unframed filter 24x25x3 4 610x635x19 mm KGAWF1306UFR 6 unframed filter 16x25x3 4 406x635x19 mm KGAWF1406UFR 6 unframed filter 20x25x3 4 508x635x19 mm KGAWF1506UFR 6 unframed f...

Страница 53: ...RMATION ON PARTS Consult your installing dealer or classified section of your local telephone directory under Heating Equipment or Air Conditioning Contractors and Systems headings for dealer listing by brand name or contact PAYNE HEATING COOLING Consumer Relations Department P O Box 4952 Syracuse New York 13221 4952 1 800 417 2963 Have available the model number series number and serial number lo...

Страница 54: ...0 W Morris St S Indianapolis IN 46206 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No IM PG8MEA 03 Replaces IM PG8MEA 02 Printed in U S A Edition Date 08 10 PG8MEA ...

Отзывы: