![Agria Cyclone 5900 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/agria/cyclone-5900/cyclone-5900_translation-of-the-original-operating-instructions_2869819037.webp)
4
Commissioning and Operation
Hydrostatic implement carrier agria 5900 Cyclone
37
4 Commissioning and Operation
Commissioning
Please note that the engine's service life and operational reliability are heavily de-
pendent on the running-in time. Always allow a cold engine to warm up for a few
minutes first of all and do not run up to full power immediately.
During the first
20
hours of operation (running-in period) do not use the engine at full
power.
Attention:
The engine is not filled up with
engine oil for transport reasons!
Fill the engine with engine oil before first com-
missioning, but do not go beyond the maxi-
mum level!
Engine operating instructions
Prior to startup, check the
gearbox oil level
.
See page 58.
Charge the battery
- the electrical adjust-
ment of the hydraulic pump and the safety valve
do not work without a charged battery.
See page 57.
This engine runs smoothly with conventional
un-
leaded regular and premium petrol (also E10)
as well as
Super plus.
Do not add oil to petrol.
Only use fresh, clean fuel (no older than 3
months) and only use approved fuel cans availa-
ble from specialist dealers. Do not use rusted
metal cans or plastic containers which are not
fuel-resistant.
Содержание Cyclone 5900
Страница 4: ...4 agria 5900 Cyclone Designation of parts Fig A Fig B...
Страница 18: ...2 Technical Data 18 Hydrostatic implement carrier agria 5900 Cyclone Wheel combinations track dimensions...
Страница 22: ...2 Technical Data 22 Hydrostatic implement carrier agria 5900 Cyclone...
Страница 80: ...80 Hydrostatic implement carrier agria 5900 Cyclone Petrol engine 23 HP...
Страница 83: ...Hydrostatic implement carrier agria 5900 Cyclone 83 Declaration of Conformity...
Страница 85: ...agria 5900 Cyclone 85 Fig C Petrol engine 14 HP...
Страница 87: ...agria 5900 Cyclone 87 Fig D Petrol engine 23 HP...