Agilent Technologies varian 320-MS LC/MS Скачать руководство пользователя страница 8

9300025700: Rev. A 

8

 

of 14

  

Pre-installation Instructions 

 

Humidity 

The relative humidity of the operating environment must be between 20 and 80%, with no 
condensation. Operating the LC/MS at a very low humidity may result in the accumulation and 
discharge of static electricity, shortening the life of electronic components. Operating the 
system at high humidity may create condensation and result in short circuits.  

Varian recommends using a combination temperature and humidity monitor in your installation 
site. 

;

 

Check the checklist box: Relative humidity maintained between 20 and 80%.

 

Particulate Matter 

Your installation site must not have excessive dust, smoke, or other particulate matter. 
Particulate matter may block airflow vents causing the electronics to overheat. 

;

 

Check the checklist box: Installation site is free of excessive particulate matter.

 

Power Requirements 

212-LC  

Power Input: 85-264V ac; 47-63 Hz; 60 Watts; 100 VA 

460-LC  

The 460-LC requires 95-240V ac± 10%; 50 - 60 Hz; 200 VA. 

216-LC  

115V ac; +15/-20%; 50/60 Hz; 250 VA 
230V ac; +15/-20%; 50/60 Hz; 250 VA 

(For UPS, assume 250W) 

For 115V ac: one 5.0 AT-fuse (5 x 20 mm, IEC 127)  
For 230V ac: one 2.5 AT-fuse 

All fuses supplied with the 216-LC instrument are UL-listed and CSA-certified. 

The 216-LC must be used with appliances and power sources that have the proper protective 
grounding. 

MS  

The MS requires a separate circuit, and the outlet must have adequate amperage capacity and 
a reliable ground. The power source must be clean and capable of providing up to 220-240V ac, 
50/60 Hz ±3 Hz, 1.0 kW. 

 

Содержание varian 320-MS LC/MS

Страница 1: ...114 kg 250 lb 320 MS with HTS PAL at least 103 kg 231 lb Bench does not vibrate Exhaust system is suitable Temperature maintained between 16 and 30 C 61 86 F Relative humidity maintained between 20 a...

Страница 2: ...s can be analyzed After meeting all of these requirements contact the Customer Service office in your region to schedule the installation The LC MS operates reliably under carefully controlled environ...

Страница 3: ...needed Allow additional room for maneuvering the shipping containers around corners and through doors Check the checklist box Entrance to the installation site is at least 92 cm 36 in wide CAUTION The...

Страница 4: ...ut the modules in Figure 1 Table 1 Bench Width with the 460 LC Bench Width 212 LC 460 LC MS CPU Monitor and Keyboard Total cm 26 30 53 5 18 7 51 178 cm in 10 5 12 21 7 5 20 71 in Table 2 Bench Load wi...

Страница 5: ...5 11 5 231 lb The system requires a clean flat bench The bench must be strong enough to support the weight of the modules The area under the bench must be large enough for the foreline pump If the be...

Страница 6: ...have sufficient room to connect the MS to the foreline pump If the distance between the bench and the wall is less than 10 2 4 in then the bench must be at least 94 cm 37 in deep To accommodate the v...

Страница 7: ...least 20 L min to a separate vent line Ensure that the exhaust system does not pull a vacuum on the API chamber Consult local regulations for the proper method of exhausting the fumes Check the checkl...

Страница 8: ...er particulate matter Particulate matter may block airflow vents causing the electronics to overheat Check the checklist box Installation site is free of excessive particulate matter Power Requirement...

Страница 9: ...instruments and equipment Never plug the mass spectrometer and the chromatograph into the same power source or the power source may overload Never use the free outlet on any of the power sources for e...

Страница 10: ...ags or transients The voltage must meet EN IEC 61000 4 5 and EN IEC 61000 4 11 standards for voltage stability A measured ground to neutral potential of greater than 3V ac or V dc indicates grounding...

Страница 11: ...erators require regular maintenance The customer is responsible for setting up the preventive maintenance procedures and schedules contact the nitrogen generator manufacturer The Varian Warranty does...

Страница 12: ...ean and new volumetric flask for optional APCI Table 14 Solvents for ESI or APCI Quantity each Solvent 2 4 liter bottle HPLC grade or better water new and unopened 2 4 liter bottle HPLC grade or bette...

Страница 13: ...ansit and instrument damage may have occurred One indicator is on the exterior Read and follow the instructions on the label If the tube on the ShockWatch indicator is red the carton was dropped in tr...

Страница 14: ...e and the conditions of delivery accepted The process requires at least three days Spare Parts Please refer to the Quadrupole Hardware Manual which has list of spare parts for routine operation Preven...

Отзывы: