Pre-installation Instructions 

 

Table 5 Additional Bench Space Requirements 

Function Space 

Allowance 

Provide space for air circulation, gas 
lines, and electrical connections. 

15 to 30 cm (6 to 12 in.) behind the system. 

Dissipate room heat and allow for 
routine maintenance. 

At least 76 cm (30 in.) above the system. 

Analytical Systems only:  
Provide space for solvent bottles. 

At least 30 cm (12 in.) to side of the LC. 

Please refer to the Varian LC Systems Pre-installation Instructions, part number 391483100, for 
information about LC modules. 

Use Table 6 and Table 7 to determine the required width of the bench and the weight the bench 
must support for your configuration.  

Regardless of configuration, the depth of the bench depends on the clearance between the 
bench and the wall to accommodate the vacuum hoses for the foreline pumps. 

  If the distance between the bench and the wall is greater than or equal to 10.2 cm  

(4 in.) then the bench must be at least 84 cm (33 in.) deep. The vacuum hoses will have 
sufficient room to connect the MS to the foreline pump. 

  If the distance between the bench and the wall is less than 10.2 (4 in.) then the bench 

must be at least 94 cm (37 in.) deep. To accommodate the vacuum hoses, two 5.8 cm 
(2.3 in.) holes must be drilled into the bench on the left side and to the rear of the MS 
location. 

Table 6 Bench Width Worksheet  

Bench 

Width

 

___-LC 

Auto-

sampler 

Other 

Components

MS CPU 

Monitor and 

Keyboard 

Total

 

cm ______ 

______  ______ 

53.5 

18.7 

51 

___cm 

in. ______ 

______ ______ 

21 

7.5 

20 

____in. 

;

Check the checklist box: Bench space is sufficient. 

 

Table 7 Bench Load Worksheet  

Bench 

Load 

___-LC

 

Auto-

sampler 

Other 

Components

MS CPU 

Monitor and 

Keyboard

 

Total

 

kg ______ 

_______  ______ 

61 

11.5 

5.5 

____kg 

lb ______ 

______  ______ 

134 

25.3 

11.5 

____lb 

;

Check the checklist box: Bench can support system weight. 

320-MS with 460-LC, at least 114 kg (250 lb) 
320-MS with HTS PAL, at least 103 kg (231 lb)

 

Vibration 

Ensure that the benches are free from vibrations, especially those caused by equipment in 
adjoining locations. Because the foreline pump vibrates during operation, it belongs on the floor 
below the LC/MS, not a on the bench with the LC/MS. 

;

 

Check the checklist box: Bench does not vibrate.

 

Содержание varian 320-MS LC/MS

Страница 1: ...114 kg 250 lb 320 MS with HTS PAL at least 103 kg 231 lb Bench does not vibrate Exhaust system is suitable Temperature maintained between 16 and 30 C 61 86 F Relative humidity maintained between 20 a...

Страница 2: ...s can be analyzed After meeting all of these requirements contact the Customer Service office in your region to schedule the installation The LC MS operates reliably under carefully controlled environ...

Страница 3: ...needed Allow additional room for maneuvering the shipping containers around corners and through doors Check the checklist box Entrance to the installation site is at least 92 cm 36 in wide CAUTION The...

Страница 4: ...ut the modules in Figure 1 Table 1 Bench Width with the 460 LC Bench Width 212 LC 460 LC MS CPU Monitor and Keyboard Total cm 26 30 53 5 18 7 51 178 cm in 10 5 12 21 7 5 20 71 in Table 2 Bench Load wi...

Страница 5: ...5 11 5 231 lb The system requires a clean flat bench The bench must be strong enough to support the weight of the modules The area under the bench must be large enough for the foreline pump If the be...

Страница 6: ...have sufficient room to connect the MS to the foreline pump If the distance between the bench and the wall is less than 10 2 4 in then the bench must be at least 94 cm 37 in deep To accommodate the v...

Страница 7: ...least 20 L min to a separate vent line Ensure that the exhaust system does not pull a vacuum on the API chamber Consult local regulations for the proper method of exhausting the fumes Check the checkl...

Страница 8: ...er particulate matter Particulate matter may block airflow vents causing the electronics to overheat Check the checklist box Installation site is free of excessive particulate matter Power Requirement...

Страница 9: ...instruments and equipment Never plug the mass spectrometer and the chromatograph into the same power source or the power source may overload Never use the free outlet on any of the power sources for e...

Страница 10: ...ags or transients The voltage must meet EN IEC 61000 4 5 and EN IEC 61000 4 11 standards for voltage stability A measured ground to neutral potential of greater than 3V ac or V dc indicates grounding...

Страница 11: ...erators require regular maintenance The customer is responsible for setting up the preventive maintenance procedures and schedules contact the nitrogen generator manufacturer The Varian Warranty does...

Страница 12: ...ean and new volumetric flask for optional APCI Table 14 Solvents for ESI or APCI Quantity each Solvent 2 4 liter bottle HPLC grade or better water new and unopened 2 4 liter bottle HPLC grade or bette...

Страница 13: ...ansit and instrument damage may have occurred One indicator is on the exterior Read and follow the instructions on the label If the tube on the ShockWatch indicator is red the carton was dropped in tr...

Страница 14: ...e and the conditions of delivery accepted The process requires at least three days Spare Parts Please refer to the Quadrupole Hardware Manual which has list of spare parts for routine operation Preven...

Отзывы: