Agilent Technologies varian 320-MS LC/MS Скачать руководство пользователя страница 7

9300025700: Rev. A 

7

 

of 14

  

Pre-installation Instructions 

 

MS40+ Foreline Pump 

Table 8 MS40+ Foreline Pump Details 

Item Information 

Diameter of hole in bench, if needed 

5.8 cm (2.3 in.) 

Width 

29.7 cm (11.8 in.) 

Depth  

41.8 cm (16.5 in.) 

Height 

22.8 cm (9 in.) 

Vacuum hose length 

1.8 m (6 ft) 

Power cord length 

2.5 m (8 ft) 

Serial cable length 

2.7 m (9 ft)  

Dedicated circuit 

1 circuit which can provide, 200-240V ac, 50-60 Hz, 10A 

Power cord plug 

CEE 7/7 or NEMA 6-15P 

Exhaust System 

Do not put the foreline pump in an enclosed space. The foreline pump exhaust most 
compounds introduced into the MS and small amounts of oil vapor. 
Provide an adequate fume exhaust system for the outlet of each foreline vacuum pump. Each 
foreline pump must be vented at least 2 L/min. The API spray chamber must be vented at least 
20 L/min to a separate vent line. Ensure that the exhaust system does not pull a vacuum on the 
API chamber. Consult local regulations for the proper method of exhausting the fumes. 

;

 

Check the checklist box: Exhaust system is suitable.

 

Temperature 

The optimal operating temperature is between 16 and 30 °C (61-86 

°

F). 

NOTE: As installation site temperature increases, system reliability decreases due to heat 
generated by electronic components during operation. This heat must dissipate to the 
surrounding air for reliable operation. 

The airflow around the system must be adequate. The air-conditioning system must maintain a 
constant temperature (within the operational limits) around the system. Do not place the system 
near air ducts, windows, or heating and cooling systems. The average steady-state heat load 
for the MS alone is 6,000 Btu, with a possible short-term heat dissipation of 15,000 Btu during 
startup. 

;

 

Check the checklist box: Temperature maintained between 16 and 30 °C  

(61-86 

°

F). 

 

Содержание varian 320-MS LC/MS

Страница 1: ...114 kg 250 lb 320 MS with HTS PAL at least 103 kg 231 lb Bench does not vibrate Exhaust system is suitable Temperature maintained between 16 and 30 C 61 86 F Relative humidity maintained between 20 a...

Страница 2: ...s can be analyzed After meeting all of these requirements contact the Customer Service office in your region to schedule the installation The LC MS operates reliably under carefully controlled environ...

Страница 3: ...needed Allow additional room for maneuvering the shipping containers around corners and through doors Check the checklist box Entrance to the installation site is at least 92 cm 36 in wide CAUTION The...

Страница 4: ...ut the modules in Figure 1 Table 1 Bench Width with the 460 LC Bench Width 212 LC 460 LC MS CPU Monitor and Keyboard Total cm 26 30 53 5 18 7 51 178 cm in 10 5 12 21 7 5 20 71 in Table 2 Bench Load wi...

Страница 5: ...5 11 5 231 lb The system requires a clean flat bench The bench must be strong enough to support the weight of the modules The area under the bench must be large enough for the foreline pump If the be...

Страница 6: ...have sufficient room to connect the MS to the foreline pump If the distance between the bench and the wall is less than 10 2 4 in then the bench must be at least 94 cm 37 in deep To accommodate the v...

Страница 7: ...least 20 L min to a separate vent line Ensure that the exhaust system does not pull a vacuum on the API chamber Consult local regulations for the proper method of exhausting the fumes Check the checkl...

Страница 8: ...er particulate matter Particulate matter may block airflow vents causing the electronics to overheat Check the checklist box Installation site is free of excessive particulate matter Power Requirement...

Страница 9: ...instruments and equipment Never plug the mass spectrometer and the chromatograph into the same power source or the power source may overload Never use the free outlet on any of the power sources for e...

Страница 10: ...ags or transients The voltage must meet EN IEC 61000 4 5 and EN IEC 61000 4 11 standards for voltage stability A measured ground to neutral potential of greater than 3V ac or V dc indicates grounding...

Страница 11: ...erators require regular maintenance The customer is responsible for setting up the preventive maintenance procedures and schedules contact the nitrogen generator manufacturer The Varian Warranty does...

Страница 12: ...ean and new volumetric flask for optional APCI Table 14 Solvents for ESI or APCI Quantity each Solvent 2 4 liter bottle HPLC grade or better water new and unopened 2 4 liter bottle HPLC grade or bette...

Страница 13: ...ansit and instrument damage may have occurred One indicator is on the exterior Read and follow the instructions on the label If the tube on the ShockWatch indicator is red the carton was dropped in tr...

Страница 14: ...e and the conditions of delivery accepted The process requires at least three days Spare Parts Please refer to the Quadrupole Hardware Manual which has list of spare parts for routine operation Preven...

Отзывы: