Varian 320-MS LC/MS
Quadrupole Mass Spectrometer
Pre-installation Instructions
9300025700: Rev. A
1
of 14
Pre-installation Instructions
Checklist
NOTE: Do not unpack the shipping cartons.
Check off each checklist box after satisfying each requirement as described in the instructions. All requirements
must be met before requesting installation.
NOTE: If the site is not ready for installation when the Varian
Representative arrives, Varian, Inc.
reserves the right to invoice for the Representative’s time.
REQUIREMENTS
;
Installation site is in compliance with all relevant safety regulations.
User Representative will be available during the installation and certification period.
Entrance to the installation site is at least 92 cm (36 in.) wide.
Bench space is sufficient.
Bench can support system weight.
320-MS with 460-LC, at least 114 kg (250 lb)
320-MS with HTS PAL, at least 103 kg (231 lb)
Bench does not vibrate.
Exhaust system is suitable.
Temperature maintained between 16 and 30 °C, (61-86 °F).
Relative humidity maintained between 20 and 80%.
Installation site is free of excessive particulate matter.
Specified electrical supply and power outlets are installed.
Nitrogen gas (at least 99% pure), regulator, and gas lines are installed.
Air (less than 0.1 ppm hydrocarbons), regulator, and gas lines are installed.
Argon (greater than 99.0% pure), regulator, and gas lines are installed.
Argon required only for
triple quadrupole instruments.
Materials and solvents of specified grade are on site.
Shipping cartons examined for damage. If there was any damage, the conditions were reported.
Requesting Installation
After preparing the site, contact the Customer Service office in your region to schedule installation.