![Agilent Technologies U2000 Series Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/agilent-technologies/u2000-series/u2000-series_operating-and-service-manual_2867112036.webp)
1
Getting Started
18
U2000 Series Operating and Service Guide
Configuring Your Power Sensor via Power Analysis Manager
1
Go to
Start > All Programs > Agilent N1918A Power Analysis Manager > Advance
> Power Analyzer
to launch your Power Analysis Manager.
2
With your power sensor still connected, a pop- up reminder dialog will
appear when you launch the Power Analysis Manager. The reminder
message will appear under two conditions:
a
You have not set any calibration due date for your U2000 Series. The
reminder prompts you to set your calibration due date.
b
Your calibration date is due and the reminder prompts you to send
your U2000 Series for calibration.
3
Click
OK
and you may proceed to set the calibration due date or
connect a new power sensor to proceed.
4
To set the calibration due date, go to Instrument Panel, in the System
tab, input the due date of your calibration in the Cal Due Date
property.
N O T E
For remote interface configurations of P-Series power meters, refer to
Remote
Interface Configurations
in
Agilent P-Series Power Meters Installation Guide
and for remote interface configuration of N8262A P-Series modular power
meters, refer to
N8262A P-Series Modular Power Meters Installation Guide
.
Содержание U2000 Series
Страница 1: ...Agilent Technologies Agilent U2000 Series USB Power Sensors Operating and Service Guide...
Страница 14: ...xiv U2000 Series Operating and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK...
Страница 16: ...xvi U2000 Series Operating and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK...
Страница 18: ...xviii U2000 Series Operating and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK...