![Agilent Technologies 8702D Скачать руководство пользователя страница 160](http://html.mh-extra.com/html/agilent-technologies/8702d/8702d_installation-manual_2867953160.webp)
5-16
Automated Verification – Option 011
Step 3. Device Verification
10
When the analyzer finishes measuring the standard, press
STANDARDS DONE
.
11
Connect the test port cables as shown
.
Figure 5-10. Transmission Calibration Setup
12
Press
TRANSMISSION
,
FWD TRANS THRU
.
13
When the analyzer finishes the measurement, press
FWD MATCH THRU
.
14
When the analyzer displays,
PRESS ’DONE’ IF FINISHED WITH STD(s)
,
press
STANDARDS DONE
,
DONE 2-PORT CAL
.
15
Press
SAVE/RECALL
,
SELECT DISK
,
INTERNAL MEMORY
,
RETURN
,
SAVE STATE
to save
the calibration into the analyzer’s internal memory.
16
When the analyzer finishes storing the measurement calibration, press
SELECT
DISK
,
INTERNAL DISK
.
Step 3. Device Verification
1
Press
SYSTEM
,
SERVICE MENU
,
TESTS
,
28
,
x1
,
EXECUTE TEST
.
2
At the prompt, connect the 20 dB attenuator (supplied in the verification kit)
Содержание 8702D
Страница 1: ...Agilent 8702D Lightwave Component Analyzer Installation Guide ...
Страница 10: ......
Страница 46: ......
Страница 89: ...4 33 Performance Tests 8 Test Port Crosstalk Figure 4 19 Agilent 8702D Bottom View ...
Страница 166: ......
Страница 256: ......