4
Operating the 280-DS
50
280-DS Operator’s Manual
Vessel Module Vessel Centering Arm Placement
If any of the shaft/vessel alignment tests are required then the software prompts
you to zero the encoder of the diameter arm of the Vessel Module.
1
Hold the Vessel Module in a way that does not restrict the movement of the
diameter arm (
2
Click
Zero
to continue the test.
CAUTION
Ensure the manifold and evaporation covers on the dissolution
apparatus are removed prior to using the Vessel Module. Refer
to the applicable section in the documentation of your
dissolution apparatus for removal instructions.
CAUTION
Do not place a finger in the cavity in the bottom of the Vessel
Module. Doing so can contaminate the lenses inside and cause
invalid readings.
NOTE
Prior to measuring parameters within the dissolution vessel,
please ensure that the vessel orientation at each active location is
properly established.
Содержание 280-DS
Страница 1: ...280 DS G7980AA Mechanical Qualification System Operator s Manual ...
Страница 5: ...280 DS Operator s Manual 5 1 Safety Notes Cautions and Warnings 6 ...
Страница 8: ...1 Safety 8 280 DS Operator s Manual This page was intentionally left blank except for this message ...
Страница 9: ...280 DS Operator s Manual 9 2 Introduction ...
Страница 58: ...4 Operating the 280 DS 58 280 DS Operator s Manual Figure 36 Paddle Basket Height ...
Страница 76: ...4 Operating the 280 DS 76 280 DS Operator s Manual Figure 54 Test Completion Screen Unsuccessful ...
Страница 95: ...280 DS Operator s Manual 95 5 Troubleshooting and Maintenance Preventive Maintenance 96 Troubleshooting 97 ...
Страница 101: ...280 DS Operator s Manual 101 6 Service and Warranty Service and Warranty Information 102 ...