background image

AGF Manufacturing Inc. • Phone: 610-240-4900 • Fax: 610-240-4906 • www.testandrain.com

9

MAINTENANCE INSTRUCTIONS

Maintenance is the cornerstone to keeping any system operating correctly and 
efficiently. It is the building owner’s responsibility to ensure that the M5400 has 
been drained of condensation and that the heater and alarm are working properly. 
Failure to drain condensation from the system, or conduct regularly scheduled 
testing and maintenance could result in system failure due to freezing. System 
must be maintained per NFPA 25 4.6, 4.6A, and 4.1.
It is 

especially important

 that functional testing of the heater be performed before 

the start of the winter season or when temperatures begin to approach freezing 
conditions.

Verify alarm operation:

Push and Hold the “TEST” button on the Alarm Panel for five seconds to 

1. 

verify that the alarm horn sounds and the alarm light pulses.

MODEL 5400A
Verify heater operation:
CAUTION:
 Always take the necessary precautions when entering the alarm panel 
when 120V power is present.

Loosen the four screws on the front of the 

1. 

M5400A Alarm Panel Box and carefully remove 
the cover.
Take note of the current thermostat set-point. 

2. 

Thermostat Set-Point: __________________
Turn the red Thermostat Set-Point dial clockwise 

3. 

until the heater turns on.
Reset the red Thermostat Set-Point dial to the 

4. 

previous setting.
Install the M5400A Alarm Panel Cover and tighten the four screws securely.

5. 

MODEL 5400H
Verify heater and Hot Monitor Timer operation:
CAUTION:
 Always take the necessary precautions when entering the alarm panel 
when 120V power is present.

Loosen the four screws on the front of the M5400H Alarm Panel Box and 

1. 

carefully remove the cover.
Take note of the current thermostat set-point. 

2. 

Thermostat Set-Point: __________________

Содержание COLLECTanDRAIN 5400

Страница 1: ...1 Model 5400 Owner s Manual INST 5400A_V001 4 1 15 AGF Manufacturing Inc...

Страница 2: ...eration 6 7 Operating Instructions 7 8 Maintenance Instructions 9 11 Verify Alarm Operation 9 10 Heater Operation 9 Changing Timer Setting 10 Changing Thermostat Setting 10 11 Maintenance Log 11 AGF M...

Страница 3: ...h float switch and alarm for dry pipe sprinkler systems The M5400 is designed for installation in climates where freezing or below freezing temperatures are present and result in the failure of typica...

Страница 4: ...installed Relieve air pressure from the branch line 2 Remove the existing auxiliary drain 3 Mounting Use the four mounting tabs 3 8 holes x 4 to install the M5400A to a wall or other secure structure...

Страница 5: ...as necessary NOTE Use dedicated junction boxes not provided to make wire connections when installing more than one M5400 on a circuit Connect the 120VAC Hot Wire to the circuit breaker 5 Connect the 1...

Страница 6: ...50 F 5 NOTE It is the owner s responsibility to set the thermostat based upon the climate conditions of the installed location The default setting of 50 F is adequate for outside temperatures down to...

Страница 7: ...age Ambient Temperature F Est Daily Power Consumption Rotate the red Thermostat Set Point Dial clockwise until the heater turns on 5 NOTE The alarm will sound about 2 seconds after the heater turns on...

Страница 8: ...has been drained close the Drain Valve 5 lower valve Open the Supply Valve upper valve and allow time for any 6 additional water to accumulate Repeat the process until all of the accumulated water ha...

Страница 9: ...rm Panel for five seconds to 1 verify that the alarm horn sounds and the alarm light pulses MODEL 5400A Verify heater operation CAUTION Always take the necessary precautions when entering the alarm pa...

Страница 10: ...l to the previous setting 7 Install the Alarm Panel Cover and tighten the four screws securely 8 Change Timer Setting M5400H Only NOTE It is the owner s responsibility to set the timer based upon the...

Страница 11: ...________ _________ ________________________________________________ ________ _________ ________________________________________________ ________ _________ ____________________________________________...

Страница 12: ...AGF Manufacturing Inc 100 Quaker Lane Malvern PA 19355 Phone 610 240 4900 Fax 610 240 4906 www testandrain com...

Отзывы: