20
5. Power Cable and Main Wiring Harness Installation
1. Locate the power harness.
2. Connect the power harness (006-4640A) to the battery (12 volt) using the red wire with fuse to the
positive side and the black wire to the negative.
A. The power harness must be connected to the battery!
The unit will draw more amps than
convenience outlets can handle. Any modifications of the power harness will void systems
warranty.
CONTACT HARVEST TEC IF MODIFICATION IS REQUIRED!
B. This unit will not function on positive ground tractors.
C. If the unit loses power while operating it will not keep track of accumulated pounds of
product used.
3. The power harness (006-4640A) will run from the tractor battery to the hitch. The power harness (006-
4660K) will connect to the tractor power harness (006-4640A) at the hitch. Run the Communication
harness (006-4660N) from the cab to the hitch. This wire will connect to the Communication harness
(006-4660KE). These wires will run together to the Baler Mounted Processor (006-4671SS).
4. Connect Flow Meter (006-4725A) to the Baler Mounted Processor.
5. Connect Pump Harness (006-4660Z) the Baler Mounted Processor.
6. If you have the optional Hay Indicator connect it to the Baler Mounted Processor.
7. Attach moisture cable (006-4640K) to Baler Mounted Processor.
8. Connect bale rate sensors cable (006-7202) to the extension harness (006-7400EXT) and then to the
Baler Mounted Processor.
9.
Install Baler Mounted Processor in pump plate using 5/16” lock, nut and flat washers.
NOTE: The plugs on the Baler Mounted Processor must face down. Failure to mount
correctly will void systems warranty.
System Wiring Diagram
462 Terminal
006-4670
Pump Harness
006-4660Z
Comm Terminal
to Hitch
006-4660N
Comm Hitch to Baler
006-4660L
Bale Rate Sensors
006-7202 & 006-7400EXT
Tractor to Hitch
Power Cable
006-4640A
Hitch to Baler Power Cable
006-4660K
Moisture Cable
006-4640K
Optional
Hay
Indicator
Flow Meter
006-4725A
Baler
Mounted
Processor
006-4671SS