Storage of cut sizes / IGU 

 

13.1 

During processing in the same factory

 

 

After  each  processing  step,  when  the  glass  is  stored  on  racks,  no  particular  spacer  is  needed  if  the 

original interlayer powder is still present. If for any reason there is not enough interlayer powder left on 
the glass, and particularly after the washing, we recommend that you place cork spacers between the 
sheets . The same recommendations apply for packs with several glass dimensions. 

 

The storage must be conformed to the recommendations of Section I.2. 

 

13.2 

To send cut size to another factory 

 

If the Stopray SMART coatings have to be delivered from the processing factory to another factory, 
the  following recommendations for packaging must be adhered to: 

 

A 1 mm-polyethylene foam spacer should be placed between each sheet . 

 

Care must be taken to ensure that the pack is properly attached to the rack so that the sheets do not rub 
together. 

 

The pack of glass should be packaged in watertight plastic. Sachets filled with desiccating agent should 
be placed inside the packaging. 

 
 
 

13.3 

On site 

 

When the glazing is delivered on site to be installed on the facade, it must be stored in a dry, sheltered 
and ventilated space. It must never be laid flat, nor be stored in the sun or near a heat source.  

 

Содержание SMART 30/20

Страница 1: ...SMART Processing Guide Version 4 1 May 2020 STOPRAY SMART PROCESSING GUIDE ASIA EDITION Version 4 1 May 2020 SMART 51 33 SMART 30 20 SMART 32T This version of the guide replaces and cancels all previo...

Страница 2: ...opray SMART 51 33 which can be laminated with coating against PVB should be installed in Position 2 so that coating layer is embedded within the laminated glazing and thereby protected For more inform...

Страница 3: ...11 7 3 Recommendations 12 7 4 Settings 13 7 5 Unloading 14 7 6 Heat Soak test 14 7 7 Quality control 14 7 8 Packaging 15 8 Bending 15 8 1 Curved annealed glass on a concave mould 15 8 2 Curved toughen...

Страница 4: ...t handling The glass must be stored on appropriate racks All recommendations given in this Processing Guide shall be strictly followed General comments Clamps slings lifting beams and other handling e...

Страница 5: ...the customer s port When protection is needed desiccant bags are fit on the upper side and on the lateral sides of the stack two thirds of the height from the upper corners Once the protective packag...

Страница 6: ...lied before lamination process Stopray SMART 51 Laminated against PVB 2 Shipping Stopray SMART 51 Storage in customer s facility up to 9 months Cutting Edge deletion Edge Processing On line washing He...

Страница 7: ...The coating around the edge of the glass may be removed during the cutting process provided that dust from grinding is properly removed For ease of detecting if a Stopray SMART is present in a lamina...

Страница 8: ...nsible for handling the glass must wear clean gloves suitable for handling coated glass 4 Edge Deletion Tests using different sealants have shown that under strict conditions and with a selection of s...

Страница 9: ...nt joint the compatibility of the sealant joint structural joints and weatherseals with the silkscreen enamel paint is under responsibility of the manufacturer of the insulating glazing units and shou...

Страница 10: ...AGC Stopray SMART Processing Guide Version 4 1 May 2020 Drawing given for purpose of illustration 6 1 1 Silkscreen not in contact with the sealant joint 6 1 2 Silkscreen in contact with the sealant jo...

Страница 11: ...the application Both annealed and heat treated products have similar reflection and transmission The Stopray SMART 32T is NOT self matchable IGU only toughened heat strengthened as needed by the appl...

Страница 12: ...r out of the furnace and pumping it back in again re circulation The latest generation of convection furnaces no longer have internal radiation elements They only heat the glass using pre heated air T...

Страница 13: ...profile will be adapted to obtain a flat sheet of glass as quickly as possible and to maintain this flatness until the end of the heating process If despite a maximum convection rate the glass retains...

Страница 14: ...breakage an additional heat soak test can be carried out in accordance with standard EN 14179 1 or equivalent standards for countries outside the EU AGC highly recommends using electrical equipment G...

Страница 15: ...r This is particularly important for glass thicker than 6 mm that will be subject to higher temperatures for a longer period of time The technical values stated cycle times temperatures and so forth w...

Страница 16: ...upport The cycle time lasts 15 to 20 minutes and depends largely on the size of the glass and the radius of curvature The lower blow pressure is identical to that used for clear float glass of equal t...

Страница 17: ...ide laminated coated glass Stopray SMART 51 33 is a self matchable product in position 2 of the laminated glass The opto energetic performances before and after tempering are similar Loss of thermal i...

Страница 18: ...ur own way of identifying the glass coating position kindly enforce it and continue to maintain the good practice Glazing systems should be designed to prevent de lamination or corrosion of the inside...

Страница 19: ...al brochure for sealants recommended by AGC AGC recommends indicating the external surface after assembly to ensure that the units are installed correctly Quality control It is essential to check that...

Страница 20: ...tion for Stopray SMART products available on www agc tas com describes these conditions Contact AGC Technical Advisory Service for further information aap glass agc com The described instructions must...

Страница 21: ...ndations of Section I 2 13 2 To send cut size to another factory If the Stopray SMART coatings have to be delivered from the processing factory to another factory the following recommendations for pac...

Страница 22: ...equired tests marking the glass factory production control etc 4 Disclaimer It is the responsibility of the processor to inspect the processed coated glass adequately before and after each step of fab...

Отзывы: