![AGC SMART 30/20 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/agc/smart-30-20/smart-30-20_image-processing-manual_2866387019.webp)
19
AGC Stopray SMART
–
Processing Guide
–
Version 4.1
–
May 2020
10
Assembly in Insulating Glass Unit
The Stopray SMART products are designed to be assembled in insulating glass units with the following
restrictions for the coating position.
Coating position in the IGU
1
2
3
4
Stopray SMART 51/33
Stopray SMART 30/20
Stopray SMART 32T
NG
OK
NG
NG
As such, it is essential to check that the coating is in the correct position before assembly.
The glass should be assembled in insulating glazing within one week after being heat treated.
The individual responsible for assembly must check that the coating is compatible with the sealing
products. See special brochure for sealants recommended by AGC.
AGC recommends indicating the external surface after assembly to ensure that the units are installed
correctly.
Quality control
It is essential to check that the coating is in the correct position before assembly. Any mistake could lead
to changes in performance and/or aesthetics.
Quality control for the final product (insulating glass) involves not only strict compliance with the
instructions provided in this processing guide, but also meticulous checks at each stage of the
manufacturing process.
Two or three halogen projectors must be placed at the exit of each processing machine to light the glass
correctly (vertically from the top to the bottom) to immediately detect any deviation from the regulatory
parameters that could affect the appearance of the coating (e.g. scratches or other contamination).