 Processing Guide 

 Version 4.1 

 May 2020  

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

At each stage of the processing procedure, the personnel responsible for handling the glass 
must  have the adequate equipment: safety shoes, safety gloves, safety glasses. 

 

 

Product shelf life with protection (closed packaging): the glass has to be consumed within 9 
months from the delivery in the processor’s facility.  

 

 

The  Stopray  SMART  range  is  self-matchable,  except  for  Stopray  SMART  32T:  these 
products  can  be  used  annealed  or  heat  treated  as  required  by  the  application.  Both 
annealed and heat treated products have similar reflection and  transmission characteristics. 
In case of heat treatment, the procedure and set up of the furnace in  chapter 6 of this manual 
must be strictly respected. 

 

 

Stopray SMART Coatings, when installed in insulating glazing units, have to be assembled 
with the coating towards the cavity so in position 2 of the insulating glazing.  The glass should 
be  assembled in insulating glazing within one week after being heat treated, but advisable 
to be assembled earlier. 

 

 

Stopray  SMART  51/33,  which  can  be  laminated  with  coating  against  PVB,  should  be 
installed in Position 2 so that coating layer is embedded within the laminated glazing and 
thereby protected. For more information, refer to Section 9. 

(*depends on the durability test, 

this paragraph might be removed if the test des not passed) 

 

 

We advise processing and handling this coated glass  with care in order to avoid coating 
damage.  The personnel responsible for handling must wear clean gloves  to ensure that 
no fingerprints  are  left  on  the  glass.  Therefore  we  strongly  recommend  that  everything 
coming  into  contact  with  the  coating of  the glass  during preliminary processes be pre-
validated. 

 

 

No edge deletion: Tests using different sealants have shown that, under strict conditions and 
with a  selection of sealants, prior edge-deletion is no longer required. 

 

 

Edge  deletion  is  required  for  laminating  SMART  51/33.  For  more  information,  refer  to 
Section 9. 

 

 

For the various glazing methods (traditional framing, structural glazing) tests for compatibility 
and  adherence  of  the  coating  with  the  sealant  must  be  made  in  each  case  with  the 
sealant  manufacturer.

 

 
 
 
 
 
 
 
 
 

WA R N I N G

 

Carefully read  this manual  before processing Stopray Smart products.

 

 

Preliminary Important Instructions

 

 

Содержание SMART 30/20

Страница 1: ...SMART Processing Guide Version 4 1 May 2020 STOPRAY SMART PROCESSING GUIDE ASIA EDITION Version 4 1 May 2020 SMART 51 33 SMART 30 20 SMART 32T This version of the guide replaces and cancels all previo...

Страница 2: ...opray SMART 51 33 which can be laminated with coating against PVB should be installed in Position 2 so that coating layer is embedded within the laminated glazing and thereby protected For more inform...

Страница 3: ...11 7 3 Recommendations 12 7 4 Settings 13 7 5 Unloading 14 7 6 Heat Soak test 14 7 7 Quality control 14 7 8 Packaging 15 8 Bending 15 8 1 Curved annealed glass on a concave mould 15 8 2 Curved toughen...

Страница 4: ...t handling The glass must be stored on appropriate racks All recommendations given in this Processing Guide shall be strictly followed General comments Clamps slings lifting beams and other handling e...

Страница 5: ...the customer s port When protection is needed desiccant bags are fit on the upper side and on the lateral sides of the stack two thirds of the height from the upper corners Once the protective packag...

Страница 6: ...lied before lamination process Stopray SMART 51 Laminated against PVB 2 Shipping Stopray SMART 51 Storage in customer s facility up to 9 months Cutting Edge deletion Edge Processing On line washing He...

Страница 7: ...The coating around the edge of the glass may be removed during the cutting process provided that dust from grinding is properly removed For ease of detecting if a Stopray SMART is present in a lamina...

Страница 8: ...nsible for handling the glass must wear clean gloves suitable for handling coated glass 4 Edge Deletion Tests using different sealants have shown that under strict conditions and with a selection of s...

Страница 9: ...nt joint the compatibility of the sealant joint structural joints and weatherseals with the silkscreen enamel paint is under responsibility of the manufacturer of the insulating glazing units and shou...

Страница 10: ...AGC Stopray SMART Processing Guide Version 4 1 May 2020 Drawing given for purpose of illustration 6 1 1 Silkscreen not in contact with the sealant joint 6 1 2 Silkscreen in contact with the sealant jo...

Страница 11: ...the application Both annealed and heat treated products have similar reflection and transmission The Stopray SMART 32T is NOT self matchable IGU only toughened heat strengthened as needed by the appl...

Страница 12: ...r out of the furnace and pumping it back in again re circulation The latest generation of convection furnaces no longer have internal radiation elements They only heat the glass using pre heated air T...

Страница 13: ...profile will be adapted to obtain a flat sheet of glass as quickly as possible and to maintain this flatness until the end of the heating process If despite a maximum convection rate the glass retains...

Страница 14: ...breakage an additional heat soak test can be carried out in accordance with standard EN 14179 1 or equivalent standards for countries outside the EU AGC highly recommends using electrical equipment G...

Страница 15: ...r This is particularly important for glass thicker than 6 mm that will be subject to higher temperatures for a longer period of time The technical values stated cycle times temperatures and so forth w...

Страница 16: ...upport The cycle time lasts 15 to 20 minutes and depends largely on the size of the glass and the radius of curvature The lower blow pressure is identical to that used for clear float glass of equal t...

Страница 17: ...ide laminated coated glass Stopray SMART 51 33 is a self matchable product in position 2 of the laminated glass The opto energetic performances before and after tempering are similar Loss of thermal i...

Страница 18: ...ur own way of identifying the glass coating position kindly enforce it and continue to maintain the good practice Glazing systems should be designed to prevent de lamination or corrosion of the inside...

Страница 19: ...al brochure for sealants recommended by AGC AGC recommends indicating the external surface after assembly to ensure that the units are installed correctly Quality control It is essential to check that...

Страница 20: ...tion for Stopray SMART products available on www agc tas com describes these conditions Contact AGC Technical Advisory Service for further information aap glass agc com The described instructions must...

Страница 21: ...ndations of Section I 2 13 2 To send cut size to another factory If the Stopray SMART coatings have to be delivered from the processing factory to another factory the following recommendations for pac...

Страница 22: ...equired tests marking the glass factory production control etc 4 Disclaimer It is the responsibility of the processor to inspect the processed coated glass adequately before and after each step of fab...

Отзывы: