4
Packaging and scope of delivery
►
Remove the packaging from the radiator
(Fig. 2).
►
Inspect the contents of the soil stand brack-
et package for completeness and damage.
6
7
1
5
4
2a
2b
10
8
9
4
3
Description
ZB03380001
ZB03390001
1
Bracket base
1
1
2a Supporting pipe T22
1
–
2b Supporting pipe T33
–
1
3
Lug plate
1
1
4
Sealing cap
2
2
5
Bracket block
2
2
6
Support
1
1
7
Hook
1
1
8
Washer
1
1
9
Hexagon nut
1
1
10 Grub screw
2
2
Number of soil stand brackets
►
Use the indicated number of soil stand
brackets for installation in accordance with
the steel panel radiator's length (Fig. 3).
►
Observe all information, especially the
technical data and limitations on use.
►
Transport and store only in the protective
packaging.
Pre-assembly of the soil stand bracket
►
Prepare tools and fixing material (screws,
washers and anchor) (Fig. 1).
►
Insert the sealing caps (4) into the two end
openings of the supporting pipe (2a/2b)
(Fig. 4).
►
Insert the bracket block (5) into the open-
ings provided in the supporting pipe (2a/2b)
(Fig. 4).
►
Slide the pre-assembled supporting pipe
onto the bracket base and adjust a dis-
tance of 150 mm from the finished floor
(Figs. 5/6).
►
Using the grub screws (10), fix the support-
ing pipe hand-tight (Fig. 6).
►
Insert the support (6) into the top of the
bracket base (recess facing toward the
front) (Fig. 6).
►
For the installation dimensions of the soil
stand brackets on the radiator, refer to the
table in Fig. 7.
Installing brackets
►
Align the soil stand brackets on the floor at
the specified spacing and mark the holes to
be drilled (Fig. 8).
►
Drill the holes at the marked locations
(Fig. 9).
►
Place the soil stand brackets in position,
align and, using suitable anchors, wash-
ers and screws (4 screws per bracket, max.
Ø 10 mm), fasten the brackets to the floor
(Fig. 10).
Installing the radiator
►
Carefully place the radiator on the bracket
bases (Fig. 11).
►
Attach the lug plates (3) to the top of the
radiator at the same position as the soil
stand brackets (Fig. 12).
►
Attach hook (7) to the lower lug on the
lug plate (3) and insert hook through the
oblong hole in the supporting pipe (2a/2b).
Using the hexagon nut (9) and the washer
(8), fasten hook hand-tight (Fig. 13).
►
After loosening the grub screws (10)
and the hexagon nuts (9), align the ra-
diator horizontally. Then tighten the grub
screws (10) and the hexagon nuts (9) again
(Figs. 13/14).
►
Cover the radiator completely again with
the packaging (Fig. 15).